Department of Veterans Affairs
West Haven VA Medical Center
1.6.2
Solicitation #W912WJ26RA008/VA #VAWH-689-040
Phase A2-Chilled Water Plant Replacement
Meetings
a.
Conduct regular Red Zone Meetings beginning at approximately 75 percent project completion, or three to six months prior to Beneficial Occupancy Date (BOD), whichever comes first.
b.
The Contracting Officer will establish the frequency of the meetings, which is expected to increase as the project completion draws nearer. At the beginning, Red Zone meetings may be every two weeks then increase to weekly towards the final month of the project.
c.
Using the Red Zone Checklist as a Plan of Action and Milestones (POAM) and basis for discussion, review upcoming critical activities and strategies to ensure work is completed on time.
d.
During the Red Zone Meetings discuss with the COTR any upcoming activities that require Government involvement.
e.
Maintain the Red Zone Checklist by documenting the actual completion dates as work is completed and update the Red Zone Checklist with revised planned completion dates as necessary to match progress. Distribute copies of the current Red Zone Checklist to attendees at each Red Zone Meeting.
1.7
PARTNERING
Contractor shall host the partnering session within 45 calendar days of contract award. To most effectively accomplish this Contract, the Contractor and Government must form a cohesive partnership with the common goal of drawing on the strength of each organization in an effort to achieve a successful project without safety mishaps, conforming to the Contract, within budget and on schedule. The partnering team must consist of personnel from both the Government and Contractor including project level and corporate level leadership positions. Key Personnel from the Medical Center, end user, , Contractor, key subcontractors and the Designer of Record are required to participate in the Partnering process. 1.7.1
a.
Facilitated (Formal) Partnering
Within 35 calendar days after award and prior to the start of work, host a Formal Partnering session with key personnel from the project team including both Contractor and Government personnel. All costs associated with the Partnering session including the third-party independent Facilitator Consultant, meeting room and other incidental items are the responsibility of the Contractor.
b.
Before the Facilitated (Formal) Partnering session, coordinate with the Facilitator all requirements for incidental items (such as audio-visual equipment, easels, flipchart paper, colored markers, note
The beginning of the document. Download the full file to read on.
Other documents in this bid
- JA (Class) - Interior Finishes Redacted
- JA 01 - Siemens or JCI HVAC BAS Redacted
- JA 02 - JCI Fire Redacted
- JA 03 - JCI ESS Redacted
- JA 04 - Assa Abloy Redacted
- JA 05 - AMAZ Redacted
- Specifications - Volume I
- Specifications - Volume II
- Amendment 1: Submission Requirements and Evaluation Criteria
- Amendment 1
- Amendment 2: Bidding Schedule
- Amendment 2: Specifications Section 01 22 00