Amendment 6 - 01 32 01.00 10 (Revised)
Updated
A PDF document (13 KB) attached to Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT, from the Department of the Army. Due Nov 20, 2026, 1:00 PM (UTC-5).
File name: Amendment 0006 - 01 32 01.00 10 (Revised).pdf
The full file is for paid members, or buy this bid alone.
Preview
Department of Veterans Affairs
West Haven VA Medical Center
Solicitation #W912WJ26RA008/VA #VAWH-689-040
Phase A2-Chilled Water Plant Replacement
SECTION 01 32 01.00 10
PROJECT SCHEDULE
08/23, CHG 1: 08/24
PART 1
1.1
GENERAL
REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AACE INTERNATIONAL (AACE)
AACE 52R-06
(2006) Time Impact Analysis - As Applied
in Construction
U.S. ARMY CORPS OF ENGINEERS (USACE)
ER 1-1-11
1.2
(2017) Administration -- Project Schedules
SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Project Scheduler Qualifications; G,
The authorized representative
who may be based off-site;
however, the designated
representative is required to
attend all schedule-related
meetings in person.
Preliminary Project Schedule; G,
Initial Project Schedule; G,
Periodic Schedule Update; G,
1.3
PROJECT SCHEDULER QUALIFICATIONS
Designate an authorized representative to be responsible for the preparation of the schedule and all required updating and production of reports. Submit no later than 15 calendar days after Notice to Proceed (NTP).The authorized representative must have a minimum of 5 -years experience scheduling construction projects similar in size and nature to this project with scheduling software that meets the requirements of this specification. Representative must have a comprehensive knowledge of CPM scheduling principles and application. The authorized representative must be on the job site full-time, with no other duties. Failure to meet these requirements after government acceptance will require a replacement within 10 calendar days. Deficiencies warranting replacement include rejected schedule submissions, failure to address government review comments,
SECTION 01 32 01.00 10
The beginning of the document. Download the full file to read on.
Other documents in this bid
- JA (Class) - Interior Finishes Redacted
- JA 01 - Siemens or JCI HVAC BAS Redacted
- JA 02 - JCI Fire Redacted
- JA 03 - JCI ESS Redacted
- JA 04 - Assa Abloy Redacted
- JA 05 - AMAZ Redacted
- Specifications - Volume I
- Specifications - Volume II
- Amendment 1: Submission Requirements and Evaluation Criteria
- Amendment 1
- Amendment 2: Bidding Schedule
- Amendment 2: Specifications Section 01 22 00