Amendment 6: Drawing (Revised)

Updated

A PDF document (504 KB) attached to Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT, from the Department of the Army. Due Nov 20, 2026, 1:00 PM (UTC-5).

File name: Amendment 0006 - Drawing 01-MP101 (Revised).pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

SHEET NOTES:

1.
2.
3.

A

B

13 14

CAP FOR FUTURE CONNECTION TO

SURGICAL TOWER PIPING SYSTEM.

6"CHS
14"HPS
6"PC
6"SAN
4"SAN
2"MA
6"SAN
20"CHS
20"CHR

6"CHR
6"FP
3"NHW
3"CW

5"PC

JJ

5"PC
8"HPS
8"HPS

ALL WORK SHOWN ON SHEET IS PART OF

OPTION BID 0005.

REFER TO CIVIL PLANS FOR PROJECT OPTIONS

AND PHASING PLANS.

COORDINATE SYSTEM SHUT DOWNS WITH

OWNER. SYSTEM TIE-IN WORK SHALL BE DONE

DURING THE OFF SEASON RELATED TO THE

SYSTEM. CHILLED WATER WORK SHALL BE

DONE DURING WINTER MONTHS AND STEAM

AND CONDENSATE WORK SHALL BE DONE

DURING SUMMER MONTHS.

A

B

3" LPS SERVES

BUILDING 5

3"LPS
16"CHS
10"CHR

HH

5"MPS
5"MPS

20"CHR
20"CHS
5"MPS

CHS, CHR AND LPS

PIPES FROM BLDG-6.

CONNECT TO EXISTING PIPING AT THIS

LOCATION. PROVIDE DOUBLE VALVES

ON STEAM MAIN AS INDICATED.

10"SV RISER UP

10"MPS
12"MPS
12"MPS
8"SV
6"SV

10"FP
10"FP
6"FP
6"FP
3/4"CW

ANCHOR PIPING TO EXISTING

CONCRETE STRUCTURE AT THIS

LOCATION. REFER TO F8/M404 FOR

ANCHOR DETAIL.

PIPE GUIDE

C9

C

FF

NO SCALE

C

20"CHS

ROUTE CHILLED WATER LINES

APPROXIMATELY 6" ABOVE FINISH

FLOOR ALONG PATH INDICATED.

20"CHR

PENETRATIONS SHALL BE SEALED

WITH MODULAR OR LINK RUBBER SEAL

OR AS RECOMMENDED PER DIRECT

BURIED PIPING MANUFACTURER.

(TYPICAL)

14"HPS

20"CHR

4"HWR
4"HWS
2"LPC
4"LPS

REFER TO MS-201 SHEET MECHANICAL

SITE PLAN FOR CONTINUATION.

6"PC

HPS
HWR
HWS

PROVIDE NEW STEAM

PRESSURE REDUCING

STATION IN 1/3 AND 2/3

CONFIGURATION. MATCH

EXISTING EQUIPMENT

LOAD OF 1500 LBS/HR,

60PSI INLET, 8 PSI

OUTLET.
14"HPS
20"CHS
6"PC
20"CHR

C9
01-MP101

6"PC

REFER TO MS201 FOR

CONTINUATION.

14"HPS

20" CHR BELOW AND

20" CHS ABOVE.

20"CHR

GG

16"CHS

20"CHS

20"CHR
20"CHS

ENTRANCE VIEW – BUILDING 01 MECH SG182

PRV-E

6"PC
14"HPS
2"LPC
6"CHS

EE'

10"SV

8"SV

8"SV

T

6"CHR

T

6"MPS
6"MPS

4"MPS

6"MPS

4"MPS

EE

01-PRV-1

PIPE GUIDE

PROVIDE DOUBLE GATE VALVES WITH

GLOBE VALVE BYPASS WITH 1" TAP

AND BLEED VALVE BETWEEN GATE

VALVES. TYPICAL FOR ALL DOUBLE

VALVES SHOWN ON STEAM AND

CONDENSATE PIPING.

6"SV

5"LPS

3"HPC
3"HPC

CC

10"MPS (MANIFOLD)

PRV-6E

2"MPS
6"LPS

6"HPS

5"LPS UP

6"CHR
6"CHS

5"MPS

5"LPS

BB

6"MPS

PRV-1E

8"MPS

5" HPS & 2 1/2" PC

UNDERGROUND

The beginning of the document. Download the full file to read on.