Amendment 6: Drawing (Revised)
Updated
A PDF document (723 KB) attached to Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT, from the Department of the Army. Due Nov 20, 2026, 1:00 PM (UTC-5).
File name: Amendment 0006 - Drawing CK-502 (Revised).pdf
The full file is for paid members, or buy this bid alone.
Preview
X
X
A
A
L
3A
FIBER ROLL AROUND
TYPE "C" OR "C-L" CATCH BASIN TOP
W/2
X
INLET SEDIMENT CONTROL DEVICE
AT TYPE "C" OR "C-L" CATCH BASIN
3.
4.
B
5.
6.
7.
1"
20"
BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN 6" DEEP X 6" WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
CATCH BASIN
SAND BAG
ROLL THE BLANKETS (A) DOWN OR (B) HORIZONTALLY ACROSS THE SLOPE.
PIPE SIZE
POST SIZE VARIES
WITH HEIGHT
VARIES
WITH
HEIGHT
SILT SACK
THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2" OVERLAP. REFER TO MANUFACTURER'S GUIDE FOR CORRECT STAPLE PATTERN RECOMMENDATIONS FOR SLOPE INSTALLATIONS.
SECTION X-X
CAPS
13 4" TOP RAIL
8'
HEIGHT
22.5°
45°
TEE, WYE, DEAD END
90°
L
W
AREA
(SF)
L
W
AREA
(SF)
L
W
AREA
(SF)
L
W
AREA
(SF)
4"
20"
10"
1.3
20"
10"
1.3
20"
14"
1.9
20"
10"
1.3
8"
24"
13"
2.1
24"
25"
4.1
24"
46"
7.6
24"
33"
5.4
10"
26"
19"
3.3
26"
36"
6.4
26"
66"
11.8
26"
47"
8.4
CURB DEFLECTOR
SAND BAG
9" FIBER
ROLL
W/2
TEES
LIFT STRAPS
CATCH BASIN GRATE
2.
W/2
BENDS
NOTES:
PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING EROSION CONTROL BLANKETS NOT SEED PREPARED AREA. EROSION CONTROL BLANKET MUST BE INSTALLED WITH PAPER SIDE DOWN.
W/2
X
1.
6"
6"
W
L/2
8' HIGH
"INVINCIBLE/SPEAR
POINTED" STYLE 3
RAIL SWING GATE
VARIES - SEE SITE PLAN
L/2
FACE CURVED
"INVINCIBLE/SPEAR 2
POINTED" STYLE
PICKETS OUTWARD
FROM PROTECTED SITE
A
3B
(IN.)
L
SOIL TYPE: REFER TO GEOTECHNICAL REPORT
DUMPING STRAPS
NOTES:
1. ASSUMED WORKING PRESSURE = 200 LB/IN^2
WHEN BLANKETS MUST BE SPLICED DOWN THE SLOPE, PLACE BLANKETS END OVER END (SHINGLE STYLE) WITH APPROXIMATELY 4" OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12' APART.
B
2. ASSUMED ALLOWABLE SOIL BEARING PRESSURE = 1,875 LB/FT^2
3. ALL BEARING SURFACES TO BE CARRIED TO UNDISTURBED GROUND
EROSION CONTROL BLANKET FOR USE ON SLOPES SHALL BE A BIODEGRADABLE DOUBLE NET WOVEN BLANKET WITH JUTE NETTING AND COCONUT FIBER MATRIX.
ONCE PERMANENT STABALIZATION IS ACHIEVED, REMOVE ANY NON -BIODEGRADABLE MESH, IF USED.
PLAN
54"
MIN.
FOOTING DEPTH
SECTION
4. CONCRETE TO BE 3000 PSI MIN.
3 3/4"
TYPICAL
2"
EMBED POSTS IN
CONCRETE BASE,
MIN. 36"
4000 PSI CONCRETE
@ 28 DAYS (TYP)
12"
12"
5. BLOCKS THICKNESS SHALL EQUAL PIPE DIAMETER PLUS 4" (A VALUE)
REINFORCE WITH
6"x6"xW4 10
GAUGE MESH, 2"
CLEARANCE ALL
SIDES (TYP)
NTS
NTS
NTS
SEE FILTER SOCK DETAIL F8
FOR SEDIMENT CONTROL
The beginning of the document. Download the full file to read on.
Other documents in this bid
- JA (Class) - Interior Finishes Redacted
- JA 01 - Siemens or JCI HVAC BAS Redacted
- JA 02 - JCI Fire Redacted
- JA 03 - JCI ESS Redacted
- JA 04 - Assa Abloy Redacted
- JA 05 - AMAZ Redacted
- Specifications - Volume I
- Specifications - Volume II
- Amendment 1: Submission Requirements and Evaluation Criteria
- Amendment 1
- Amendment 2: Bidding Schedule
- Amendment 2: Specifications Section 01 22 00