Amendment to a Previous Combined Solicitation

SUBJECT

B258 ADA Ramp Project B258 ADA Ramp

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE

SOLICITATION NUMBER

RESPONSE DATE/TIME/ZONE

ARCHIVE

RECOVERY ACT FUNDS

SET-ASIDE

PRODUCT SERVICE CODE

NAICS CODE

CONTRACTING OFFICE ADDRESS

90815
36C26227Q0113

11-20-2026 13:00 PACIFIC TIME, LOS ANGELES, USA

30 DAYS AFTER THE RESPONSE DATE

N

SDVOSBC

J054
238990
Department of Veterans Affairs
Network Contracting Office 22
4811 Airport Plaza Drive
Suite 600
Long Beach CA 90815

POINT OF CONTACT

Contract Specialist
Marco Ramos
[email protected]

PLACE OF PERFORMANCE

ADDRESS

POSTAL CODE

COUNTRY

Department of Veterans Affairs
Greater Los Angeles VA Healthcare System
Medical Center
11301 Wilshire Blvd.
Los Angeles CA
90073
USA

DESCRIPTION

Question 1. Exhibit B (PVI drawing XP3BR2936) shows a 29 in rise and a 30 ft 4 in ramp ending at a through/open landing. Is that the intended layout, and what landing size should quoters assume? If the landing connects to the existing entry porch through the existing porch railing, may the contractor open that railing?
Answer: The exhibit included in the Statement of Work (SOW) is intended as a sample cut sheet for reference purposes only.
The actual site dimensions and layout must be field-measured and verified to ensure an accurate design. The required ramp rise can be preliminarily estimated based on the number and height of the existing steps, while the ramp run, slope, landings, and other accessibility *= Required Field

Amendment to a Previous Combined Solicitation

requirements must be determined in accordance with applicable ADA standards and VA requirements.
The final design and all associated specifications must comply with the VA Technical Information Library (TIL), including applicable design criteria, accessibility standards, and regulations.
Question 2. The SOW calls for a through/open gate at the landing pad. Is a gate required on the landing, or does through/open describe the landing's open-ended configuration? Answer: A gate may not be necessary. The primary objective is to ensure the safety and accessibility of individuals using the ADA ramp when entering and exiting the building. The final design should prioritize safe pedestrian circulation, minimize potential hazards, and comply with applicable ADA standards and VA TIL requirements. Question 3. Will the VA hold a site visit before quotes are due? Answer: No, there will be no site visit for this requirement.

The beginning of the document. Download the full file to read on.