Home / U.S. Army Contracting Command – Anniston Army Depot… / Document

AoI 005 - Solid Waste Disposal REV 1

Updated

A PDF document (148 KB) attached to U.S. Army Contracting Command – Anniston Army Depot (CCTA-HDA) Organic Industrial Base (OIB) Modernization Commercial Solutions Opening (CSO), from the Department of the Army. Due May 18, 2030, 5:00 PM (UTC-5).

File name: AoI 005 - Solid Waste Disposal REV 1 4.22.26.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Federal Agency: Army
Office: Army Contracting Command-Anniston Army Depot (ACC-ANAD) AoI Title: Solid Waste Disposal

CSO AoI Number: AoI 005
AoI Release Date: 7 April 2026
Responses: See W911KF-25-S-C002 for Procedure Details
*Special Note – This requirement is for a Base and 4 Option Years.* Questions and Answers:
Question #1: Do you have a list of the container sizes and the weekly frequency that they are picked up?
Answer #1: Front load dumpsters range from 2 to 8 cubic yards. Actual size depends on location and volume and are sometimes adjusted according to the requirement. There is approximately 250 of these size containers placed across the installation. They are emptied on Mondays, Wednesdays, and Fridays. There are approximately 145, 20, 30, and 40, yard roll off containers with the majority being 40 yard. Size is dependent on type and volume of waste. The process determining the frequency they are picked up is described in the SOW as observation and coordination between the Depot POC and contractor POC. They will be prioritized based on mission requirements. The contract should plan to have extra and replacement containers readily available on site for special projects or container failure.
Additional questions will not be accepted in relation to this AoI.

1.0
Objective
The Government has a need for the routine removal and disposal of various types of solid waste materials located at the Anniston Army Depot (ANAD) utilizing contractor provided dumpsters and roll-off containers, with some materials requiring recycling. Additionally, the Government has a need for movement of hazardous waste roll-off containers on an as needed basis.

2.0

Applicable Publications, Regulations, and Definitions

2.1

The following publications and regulations with the latest amendments form

a part of this specification.
• Alabama Water Pollution Control Act, Sections 22-22-1 et seq., Code of Alabama (1975) as amended.
• Alabama Environmental Management Act, Sections 22-22a-1 et seq., Code of Alabama (1975) as amended.
• Alabama Air Pollution Control Act, Sections 22-28-1 et seq., code of Alabama (1975) as amended.
• Hazardous Waste Management and Minimization Act, Sections 22-30-1 et seq., Code of Alabama (1975) as amended.
• Solid Waste Disposal Act, Sections 22-27-1, et. seq., Code of Alabama (1975) as amended.
• Alabama Department of Environmental Management Administrative Code: • ADEM Admin. Code R. 335-1-.01 et seq. /- General Administration

The beginning of the document. Download the full file to read on.

Other documents in this bid