Home / Misty Barge Dry Dock Services / Document

Appendix 3 Misty Barge Photos

Updated

A PDF document (2.8 MB) attached to Misty Barge Dry Dock Services, from the Forest Service. Due Oct 30, 2026, 1:00 PM (UTC-8).

File name: C04 Appendix 3 Misty Barge Photos.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Misty Barge 2025

Misty barge during its last drydock in 2022

Back side of hoist holds missed in previous
drydock work to be prepared and painted

Rub area damage from dock.

More rub area damage from docks

Rub area to be addressed in drydock.

Anchor and chain to be cleaned.

Anchors to be cleaned

Deck items to be removed

Rust dust and deposits from water ponding
towards forward compartment

Towards forward compactment

Same corner with rust spots on side hull bracing.

Up close behind water system rust spots

Water Treatment System

View looking towards Port side of the water
treatment system with two potable water tanks
on left side and raw water on right side.

View looking towards Port side of the RO system
with the two fuel oil tanks on the left and two
potable water tanks on the right.

Rust spots below RO unit.

Overflow drain on RO unit – rusting at fuel tank

Overflow drain on RO unit

Beneath the RO unit

Beneath the RO unit stand

Clean up RO system framing and stand from rust - similar treatment to interior hull.

Anchor stand on similar barge

The beginning of the document. Download the full file to read on.

Other documents in this bid