Appendix 3 Misty Barge Photos
Updated
A PDF document (2.8 MB) attached to Misty Barge Dry Dock Services, from the Forest Service. Due Oct 30, 2026, 1:00 PM (UTC-8).
File name: C04 Appendix 3 Misty Barge Photos.pdf
The full file is for paid members, or buy this bid alone.
Preview
Misty Barge 2025
Misty barge during its last drydock in 2022
Back side of hoist holds missed in previous
drydock work to be prepared and painted
Rub area damage from dock.
More rub area damage from docks
Rub area to be addressed in drydock.
Anchor and chain to be cleaned.
Anchors to be cleaned
Deck items to be removed
Rust dust and deposits from water ponding
towards forward compartment
Towards forward compactment
Same corner with rust spots on side hull bracing.
Up close behind water system rust spots
Water Treatment System
View looking towards Port side of the water
treatment system with two potable water tanks
on left side and raw water on right side.
View looking towards Port side of the RO system
with the two fuel oil tanks on the left and two
potable water tanks on the right.
Rust spots below RO unit.
Overflow drain on RO unit – rusting at fuel tank
Overflow drain on RO unit
Beneath the RO unit
Beneath the RO unit stand
Clean up RO system framing and stand from rust - similar treatment to interior hull.
Anchor stand on similar barge
The beginning of the document. Download the full file to read on.