STATEMENT OF WORK
Arrow Canyon SNPLMA Project – Kiosk Purchase and Installation
1. Background
The Arrow Canyon SNPLMA Project (BL90) supports the protection, interpretation, and public education of the significant cultural and natural resources associated with Arrow Canyon. As part of the project, the Bureau of Land Management (BLM) requires the procurement and installation of three outdoor interpretive kiosks and associated interpretive panels.
Arrow Canyon is managed by the BLM Las Vegas Field Office and includes designated wilderness. The Contractor shall perform all work in accordance with applicable BLM requirements governing access, resource protection, safety, and use of equipment.
2. Objective
The objective of this requirement is to provide, deliver, and install three durable outdoor interpretive kiosks and associated interpretive panels at BLM-approved locations within the Arrow Canyon project area.
The completed kiosks will provide visitors with educational information concerning the cultural, archaeological, wildlife, and natural-resource values of Arrow Canyon and appropriate resource-protection practices.
3. Scope of Work
The Contractor shall:
1. Furnish three (3) double-panel, outdoor-rated metal interpretive kiosks. Each kiosk shall accommodate two (2) 48-inch x 48-inch interpretive panels and meet the technical requirements specified in this Statement of Work. 2. Coordinate with designated BLM personnel regarding the layout and graphic design of interpretive panels.
3. Produce and print the final approved interpretive panels using materials and printing processes suitable for permanent outdoor exposure in southern Nevada. 4. Transport the kiosks and interpretive panels to the Government-designated staging/location area.
5. Assemble and install the kiosks at three (3) Government-approved locations. 6. Furnish all labor, materials, fasteners, anchors, concrete, foundations/footings, excavation, tools, equipment, transportation, handling, mobilization, and other items necessary to complete the installation unless specifically identified as Government-furnished.
7. Clean each installation area and restore areas disturbed by Contractor activities.
8. Provide final documentation and electronic copies of the approved sign artwork and as-built information for the kiosk installations.
4. Government-Furnished Information
The Government will provide:
•
Government-approved kiosk installation locations following contract award.
•
Interpretive subject matter and substantive interpretive content.