Atch 7 Statement of Work Supplemental Requirements
Updated
A Word document (127 KB) attached to Pioneering Aerospace Capabilities, Engineering and Research, from the Department of the Air Force. Due May 10, 2031, 3:00 PM (UTC-4).
File name: Atch 7 SOW Supplemental Requirements.docx
The full file is for paid members, or buy this bid alone.
Preview
(READ AND DELETE: The Contracting Officer will, in conjunction with the COTR/COR (e.g., via answers provided on the ICO Tool), select the applicable additional requirements from the list below, and include this document as a separate attachment to the contract/order. Delete any non-applicable requirements before saving the final document. All language in bold italics throughout this document is instructional text and must also be deleted before saving the final document. Ensure terminology is tailored according. Sequentially number the applicable paragraphs (e.g., 1, 2, 3, etc.); the AFRL conventional SOW paragraph numbering scheme (e.g., 4.0, 4.1, etc.) is not required. Insert the date and attachment number. Just as with any attachment, if this attachment is sent to the Contractor, and then is subsequently modified, be sure to update the date of the attachment so that it is clear that the updated version supersedes any older copies that may be circulating around the Contractor’s facility. Any questions can be addressed to AFRL/PKL.)
Statement of Work (SOW)
(or replace SOW with Performance Work Statement (PWS), if services)
AFRL Supplemental Requirements
Version 26.3
3 June 2026
1. INTRODUCTION. The following paragraphs are also considered be a part of the SOW (replace with PWS, if services) requirements and the Contractor is responsible for compliance to the same extent as the rest of the SOW (replace with PWS, if services).(If proposal is incorporated by reference replace with the following “The following paragraphs are also considered to be a part of the Contractor’s proposal, incorporated herein by reference and the Contractor is responsible for compliance to the same extent as the rest of the Contractor’s proposal”)
2. PACKAGING AND MARKING. The following requirement should be included when there is delivery of hardware.
PACKAGING AND MARKING
All hardware deliverable contract items shall be packaged in accordance with established commercial practices.
When special delivery and/or handling instructions are required, all boxes and/or crates must contain the following statement in plain sight and in bold letters:
INSTRUCTION TO RECEIVING OFFICE – DO NOT OPEN; CONTENTS ARE SENSITIVE TO DAMAGE WHEN IMPROPERLY OPENED OR HANDLED. CONTACT THE RESPONSIBLE TECHNICAL PROJECT OFFICER IMMEDIATELY UPON RECEIPT. CONTACT INFORMATION: XXX (insert POC’s name and contact information).
3. COMSEC MONITORING. The following requirement should be included in all contracts.
COMMUNICATIONS SECURITY (COMSEC) MONITORING
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Atch 1 Supplemental Instructions for Assistance Instrument Proposals
- Atch 10 Broad Agency Announcement Attachment - Security Program Questionnaire
- Atch 3 Section K - Representations and Certifications
- Atch 4 Section L - Instructions Conditions and Notices to Offerors
- Atch 5 DFARS 252.215-7009 Proposal Adequacy Checklist
- Atch 6 Contract Data Requirements List (Contract Data Requirements List)
- Atch 8 Statement of Work Supplemental Requirements
- Call for CC DROIDS Attachments
- Call for CC DROIDS
- CALL for INNATE and Attachments
- Amendment 1--CC DROIDS CAll -QA
- Amendment 2--CC DROIDS Call-Questions and Answers