ATR Plant Protection System Seismic Switch Replacement EOI

Updated

A PDF document (209 KB) attached to ATR Plant Protection System (PPS) Seismic Switch Replacement, from the Department of Energy. Due Apr 23, 2027, 11:59 PM (UTC-6).

File name: ATR Plant Protection System (PPS) Seismic Switch Replacement EOI.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

ATR Plant Protection System (PPS) Seismic Switch
Replacement

Expression of Interest (EOI)

Expression of Interest
ATR Plant Protection System (PPS) Seismic Switch Replacement

INTRODUCTION

Battelle Energy Alliance, LLC (BEA), the management and operating contractor for the U.S. Department of Energy-owned Idaho National Laboratory (INL), is seeking Expressions of Interest (EOI) from qualified suppliers capable of providing environmentally and seismically qualified seismic switches for use in the Advanced Test Reactor (ATR) Plant Protection System (PPS). The purpose of this EOI is to identify suppliers with the technical capability, quality assurance program, testing facilities, and experience necessary to provide safety-related seismic switch equipment qualified for nuclear applications. This EOI is being issued for market research and acquisition planning purposes and is intended to identify potential suppliers for a future procurement opportunity. The EOI process is used by INL to develop a list of qualified and interested vendors that may be considered for future solicitations.

BACKGROUND

The ATR Plant Protection System currently utilizes seismic switches to provide a critical reactor protection function. Seismic switches detect ground motion and initiate a reactor scram when predetermined seismic thresholds are exceeded.
The existing Kinemetrics Model TS-3A seismic switches are obsolete and have demonstrated performance degradation, resulting in increased reliance on limited spare inventory. Additionally, one seismic switch is currently out of service, placing the PPS in a reduced logic configuration. Replacement with modern, supported equipment is required to restore normal system configuration and ensure long-term reliability and maintainability.

SCOPE OF INTEREST

BEA seeks information from suppliers capable of providing complete seismic switch solutions meeting the functional, environmental, seismic qualification, testing, documentation, and quality assurance requirements typically associated with nuclear safety-related applications. Functional Capability
• Three-axis ground motion sensing capability.
• Dry contact output suitable for reactor protection system input. • Adjustable seismic trip setpoints.
• Response times consistent with nuclear protection system applications. • Long-term reliability and maintainability.
• In-situ testing and calibration capabilities.
•

Environmental and Seismic Qualification
Respondents should be capable of qualifying equipment consistent with applicable industry