Home / Project 695-24-107 Replace Boilers 4 and 5 Clement J.… / Document

ATT C - Specifications

Updated

A PDF document (5.0 MB) attached to Project 695-24-107 Replace Boilers 4 and 5 Clement J. Zablocki, VA Medical Center 5000 West National Avenue Milwaukee, WI 53295, from the Department of Veterans Affairs. Due Nov 18, 2026, 11:00 AM (UTC-6).

File name: S02 - ATT C - Specifications.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

716.592.3980

encorus.com

100% CONSTRUCTION DOCUMENTS

MASTER CONSTRUCTION

SPECIFICATIONS

For:

Replace Boilers 4 & 5
Prepared For:
Department of Veterans Affairs
Clement J. Zablocki VA Medical Center
5000 W. National Avenue
Milwaukee, WI 53295

April 6, 2026
VA Contract No. 36C25224D0005
VA Project No. 695-24-107
Encorus Project No. 24283

Milwaukee VAMC
695-24-107 Replace Boilers 4 & 5
Milwaukee, WI 53295

06-01-24
100% Construction Documents
04/06/2026

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

Section 00 01 10

SECTION NO

DIVISION AND SECTION TITLES

DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15

List of Drawing Sheets

05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00

01 01 10 SN

01 32 16.15

01 33 23

01 33 23 A

01 35 26

01 35 26 A

01 35 26 B

01 42 19

01 45 29

01 57 19

01 74 19

01 74 19 A

01 91 00

General Requirements
Special Notes
Project Schedules (Small Projects – Design/Bid/Build)
Submittals, RFIs, and CBs
Division 01 Submittals and Template for Submittal Log
Safety Requirements
PCRA Draft
ICRA Standards
Reference Standards
Testing Laboratory Services
Temporary Environmental Controls
Construction Waste Management
CWMP Template
General Commissioning Requirements

11-21
02-26
12-25
11-23
02-26
05-24
02-26
04-26
11-20
09-24
10-22
10-22
10-22
04-22

DIVISION 02 – EXISTING CONDITIONS

02 41 00

Demolition

09-17

DIVISION 03 – CONCRETE

DIVISION 04 – MASONRY

DIVISION 05 – METALS

05 12 00

05 50 00

Structural Steel Framing
Metal Fabrications

11-18
08-18

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 01 50.19

07 08 00

07 40 00

07 53 23

07 60 00

07 72 00

Preparation for Re-Roofing
Facility Exterior Closure Commissioning
Roofing and Siding Panels
Ethylene-Propylene-Diene-Monomer Roofing
Flashing and Sheet Metal
Roof Accessories

00 01 10-1

01-21
01-21
01-21
01-21
01-21
01-21

Milwaukee VAMC
695-24-107 Replace Boilers 4 & 5
Milwaukee, WI 53295

SECTION NO

07 84 00

07 92 00

06-01-24
100% Construction Documents
04/06/2026

DIVISION AND SECTION TITLES

Firestopping
Joint Sealants

DATE

01-21
04-22

DIVISION 08 - OPENINGS

08 33 00

Coiling Doors and Grilles

01-21

DIVISION 09 – FINISHES

09 91 00

Painting

01-21

DIVISION 13 - SPECIAL CONSTRUCTION

DIVISION 22 – PLUMBING

22 05 11

22 13 00

Common Work Results for Plumbing
Facility Sanitary and Vent Piping

01-23
09-20

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 10

The beginning of the document. Download the full file to read on.

Other documents in this bid