Attachment 1 668-22-106 Construction - Statement of Work R2
Updated
A PDF document (185 KB) attached to CON-NRM-668-22-106 Correct Domestic Water System, from the Department of Veterans Affairs. Due Nov 23, 2026, 12:00 PM (UTC-8).
File name: Attachment 1 668-22-106_Construction - SOW R2.pdf
The full file is for paid members, or buy this bid alone.
Preview
STATEMENT OF WORK FOR CONSTRUCTION SERVICES
Correct Domestic Water System
Deficiencies Buildings 1 and 12
Project No. 668‐22‐106
Mann-Grandstaff VA Medical Center
Spokane, WA
June 9, 2026
Attachments to this document include the following. Contact the CO if any items are missing.
•
Project Drawings
•
Project Specifications
1. Contract Title. 668‐22‐106 Correct Domestic Water System Deficiencies Buildings 1 and 12.
2. General.
The Veterans Affairs (VA) Spokane Healthcare System, Spokane, WA requires labor, materials, equipment, and other services as necessary for construction project 668‐22‐ 106. Scope of work is indicated below.
3. Scope.
In accordance with the Drawings and Specifications, this project modifies the existing hot and cold potable water distribution systems in Buildings 1 and 12 to satisfy the requirements of document “VHA DIRECTIVE 1061 Prevention of Health CareAssociated Legionella Disease and Scald Injury from Water Systems 1021-02-16”. The contractor shall provide all supervision, labor, tools and materials, installation, training, Pre-commissioning documentation, O&M documentation, and one-year warranty of materials and installation. Contractor shall do a field verification to ensure all equipment, parts and materials are identified and verify all the existing conditions.
4. Legionella Risk Reduction Measures:
Starting when domestic (potable) plumbing piping and fixtures are installed and functional, after cold and hot water sanitization, and continuing until receipt of Beneficial Occupancy acceptance is the contractor’s responsibility, all sinks, lavatories, drinking fountains, bottle fills, ice machines, soda machines, or other potable water dispensing fixtures shall be flushed twice weekly to remove any stagnant water in the piping or fixtures. Flushing shall consist of running fixtures or faucets, beginning with fixtures closest to point of connection to source water supplies, for a minimum of 5 minutes, continuing to fixture furthest from water source.
5. Deliverables:
Inspection, testing, and warranty documents and manuals in accordance with the specifications.
6. Document Transmission:
Construction Contractor shall provide a secured File Transfer Protocol (FTP) site to transfer all contract electronic submittals. The contractor shall send a corresponding email to the COR stating a file is ready for review for each electronic submittal FTP upload, an automatic email from the FTP site is sufficient. The FTP site shall be accessible by VA staff
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Bid document
- Attachment 10 - 668-22-106 - Past Performance Questionnaire
- Attachment 3 - 668-22-106 Construction - Specifications
- Attachment 4 - 668-22-106 PCRA Pre-Construction Risk Assessment Checklist ver6
- Attachment 5 - 668-22-106 ICRA VHA ICRA 2023-1 TypeA Low-High Risk
- Attachment 6 - 668-22-106 ICRA VHA ICRA 2023-1 Type B Level3
- Attachment 9 - 668-22-106 - Contractor Rules of Behavior