BATTELLE MEMORIAL INSTITUTE, PACIFIC NORTHWEST DIVISION'S
REQUEST FOR INFORMATION NUMBER RFI-2026-11-16-GP
PROCUREMENT AND INSTALLATION OF A MEDIUM-SCALE SUPERCONDUCTING QUANTUM COMPUTER
ATTACHMENT 3, RFI QUESTIONNAIRE
It is understood that respondents may not have the knowledge or expertise to answer every question. Respondents should answer to the best of their ability.
A. System and Measured Performance
A1.Describe the processor you would propose to deliver within the schedule in Section 4: qubit count, qubit type (e.g., fixed-frequency transmon, tunable transmon, fluxonium, other), coupler type, and lattice topology. Provide the connectivity graph.
A4.What system availability (percentage of scheduled time the system is executing user jobs at specification) do you commit to in on-premises contracts, and what has been achieved at existing installations over the past 12 months?
B. Access, Software, and Operation
B1.Describe the control electronics (in-house or third-party), channel counts, real-time capability, and the level of access users have to pulse definition, waveform upload, and real-time control flow.
B2.Describe integration with an HPC scheduler (e.g., Slurm) and with classical compute co-located with the system, the classical-to-quantum latency achievable for tightly coupled hybrid workflows, and the recommended network topology.
B3.Can the system be operated fully on-site with no external network dependency? If not, identify the functions that require connectivity to supplier services.
B4.Will you permit Battelle to run independent benchmarks, including application-level benchmarks defined by Battelle, and to publish the results without vendor approval, subject to a reasonable review period for factual accuracy?
B5.What, if any, major issues and/or challenges have been encountered during quantum computer installations?
B6.What, if any, major issues and challenges have you encountered during the procurement of quantum computers?
C. Upgrade Path
C1.What hardware refresh do you offer within a three to five year lease, at what cadence, at what cost, and with what downtime?
D. Security and Export Control
D1.Describe the remote-access architecture used for calibration and diagnostics (protocols, endpoints, authentication, logging) and whether access can be limited to customer-initiated sessions.
D2.State the export classification of the proposed system (e.g., ECCN 4A906), its country of origin, and how you manage return, re-export, and remote technical-data transfer for systems installed in the United States.