Attachment 1: AIT Statement of Work Draft
Updated
A PDF document (982 KB) attached to AIT Follow-on - Sources Sought Notice, from the Department of the Navy. Due Oct 27, 2026, 5:00 PM (UTC-7).
File name: Attachment 1_AIT SOW_Draft.pdf
The full file is for paid members, or buy this bid alone.
Preview
STATEMENT OF WORK
1. SCOPE
1.1 Background
AF
T
The Naval Undersea Warfare Center (NUWC) Division, Keyport Fleet Readiness and Unmanned and Theater Undersea Warfare Systems Departments is responsible for providing Engineering, Maintenance, Alteration Installations, and Technical Support for various systems installed on board United States (U.S.) Navy vessels. The NUWC Systems Engineering Division is responsible for: developing alteration installation packages supporting upgrades; fielding systems through the alteration installation process; preparing, planning, and providing conformance documentation to support the installation of various alterations; conducting pre-and post-installation testing; publishing alteration installation results and completion reports; and, maintaining a Naval Sea Systems Command (NAVSEA) approved Alteration Installation Team (AIT) Quality Assurance Program and Process.
The programs and systems relevant to this SOW include, but are not limited to: 1. Next Generation Fathometer (NGF) AN/UQN-10 or AN/UQN-10 Sonar Sounding Set Fathometer
2. Carrier Tactical Support System (CV-TSC) AN/SQQ-34C(V)X
3. Nimitz-class Aircraft Carrier (CVN)
R
4. Ford-Class Aircraft Carrier (CVN)
5. Littoral Combat Ship (LCS) Freedom and Independence variants
6. Ticonderoga-Class Cruisers (CG)
7. Arleigh Burke-Class Destroyers / Zumwalt-Class Destroyers (DDG)
D
8. Amphibious Ships (Amphibious Assault Ship (LHA), Amphibious Assault Ship (LHD), Amphibious Transport Dock (LPD), Dock Landing Ship (LSD) and Command Ship (LCC))
This contract does not require privileged access to classified workspaces requiring above secret clearance. There is no need to access areas where Naval Nuclear Propulsion Information (NNPI) exists to include engine rooms.
The systems when installed are unclassified. For CV-TSC, the contractor will provide troubleshooting and repair support for a System Operational Validation Test (SOVT) once
the system is installed to validate power and basic data connectivity. Once handed over to the Navy, the Navy will install software for the system to be fully operational. The system is only approved at a SECRET level.
1.2 This Statement of Work (SOW) is to provide Alteration Installation Team (AIT) services to NUWC Keyport onboard surface platforms.
These services include, but are not limited to:
T
1. Installation and engineering support
2. Removal and modification of equipment or systems
3. Welding
4. Rigging
AF
5. Fire watch
6. Erecting scaffolding
7. Opening and closing of ship bulkheads and hull access cuts
The beginning of the document. Download the full file to read on.