Home / Cost Engineering and Related Services / Document

Attachment 1: Capabilities Questionnaire

Updated

A Word document (33 KB) attached to Cost Engineering and Related Services, from the Department of the Navy. Due Nov 10, 2026, 2:00 PM (UTC-5).

File name: Attachment 1 Capabilities Questionnaire N6247027R0007.docx

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

ATTACHMENT 1: CAPABILITIES QUESTIONNAIRE

Use this form to provide general information. The space at the end of the form may be used to clarify any requested information. Please respond to all questions as completely as possible.

SECTION 1. GENERAL

A. Business Name: (Insert Business Name)

B. Business Address: (Insert Business Address)

C. Is your firm registered under the NAICS code 541330? (Yes or No). E. Does your firm employ more than 20 full-time personnel? (Yes or No) a. Capability (key personnel) to perform such work. Please list the number of personnel listed below on your staff: Disciplines (Engineers and Architects that are Registered) # of personnel
Cost Engineer
Value Engineer
Scheduler
Risk Analyst
Staff Economist
Architect
Civil Engineer
Structural Engineer
Mechanical Engineer
Electrical Engineer
Fire Protection Engineer
Geotechnical Engineer
Planner
Interior Design

F. Responsible Point of Contact:

Name: (Insert Name)
Telephone: (Insert Telephone Number)
Email: (Insert Email Address)
SECTION 2. TYPE OF BUSINESS: (check all that apply)

EXPERIENCE:

What is your Firm’s highest dollar valued AE contract within the last five years?

The $15M Cost IDIQ may require work as follows. Select all that apply that the Firm has performed within the past five years: Military Construction (MILCON) project detailed construction cost estimates (Yes or No) Concept and budget estimates for complex facilities construction (Yes or No) NAVFAC DD Form 1391 Documentation (Yes or No)
Economic analysis, life cycle cost analysis, Total Ownership Costs and other non-present value cost analyses (Yes or No) Charrette facilitation (Yes or No)
Cost, Schedule and Risk Analysis (CSRA) (Yes or No)
Construction Schedule (Yes or No)
Value Engineering Studies (Yes or No)
Database and cost estimating tool creation (Yes or No)
Quality/Constructability Reviews (Yes or No)

Does your Firm have the ability to simultaneously manage multiple projects totaling $3M or more per year? (Yes or No)

How many $750K task orders can the firm successfully perform and manage at one time: One task order
Two task orders
Three task orders
Four task orders
Five task orders
More than five task orders

Has the Firm developed multiple concurrent detailed cost estimation documents at least $2M in AE contract value? (Yes or No) If yes, indicate how many, when and locations of the projects.

The Firm has performed these types of services within the past 5 years:

The beginning of the document. Download the full file to read on.

Other documents in this bid