Home / 763-25-700 EHRM Infrastructure Upgrades Construction Dallas… / Document

Attachment 1: EHRM Specifications

Updated

A PDF document (6.4 MB) attached to 763-25-700 EHRM Infrastructure Upgrades Construction Dallas CMOP, TX, from the Department of Veterans Affairs. Due Dec 23, 2026, 1:00 PM (UTC-5).

File name: Attachment 1 - EHRM Final Specifications.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

763-25-700 | EHRM Infrastructure Upgrades
VA Consolidated Mail-Order Pharmacy – Dallas, TX.

Final Bid Documents
April 03, 2026

Specifications Sign and Seal: 04/03/2026
Texas Architectural Registration No. 32226

Specifications Sign and Seal: 04/03/2026
Texas Engineer (Electrical) Registration No. 144295

Specifications Sign and Seal: 04/03/2026

RCDD BICSI ID No. 328601

A | 312 SW 25th St. Oklahoma City, OK 73109

P | 405.842.6100

E | [email protected]

W | spur-design.com

763-25-700 | EHRM Infrastructure Upgrades
Dallas Consolidated Mail Outpatient Pharmacy – Dallas, TX Final Bid Documents
10-01-2025

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

Section 00 01 10

SECTION NO

DIVISION AND SECTION TITLES

DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15

List of Drawing Sheets

05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00

01 32 16.15

01 33 23

01 35 26

01 42 19

01 45 00

01 74 19

01 81 13

01 91 00

General Requirements
Project Schedules (Small Projects – Design/Bid/Build
Shop Drawings, Product Data, and Samples
Safety Requirements
Reference Standards
Quality Control
Construction Waste Management
Sustainable Construction Requirements
General Commissioning Requirements

11-21
11-23
06-25
05-24
11-20
02-21
04-22
10-17
04-22

DIVISION 02 – EXISTING CONDITIONS

02 41 00

Demolition

08-17

DIVISIONS 03 THROUGH 04 – NOT USED

DIVISION 06 – WOOD, PLASTICS, & COMPOSITES

06 10 00

Rough Carpentry

10-17

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 84 00

07 92 00

Firestopping
Joint Sealants

01-21
04-22

DIVISION 08 – OPENINGS – NOT USED

DIVISION 09 – FINISHES

09 05 16

09 22 16

09 29 00

09 65 13

09 65 19

09 91 00

Subsurface Preparation for Floor Finishes
Non-Structural Metal Framing
Gypsum Board
Resilient Base and Accessories
Resilient Tile Flooring
Painting

DIVISIONS 11 THROUGH 25 – NOT USED

00 01 10-1

01-21
06-18
04-20
01-21
05-18
01-21

763-25-700 | EHRM Infrastructure Upgrades
Dallas Consolidated Mail Outpatient Pharmacy – Dallas, TX Final Bid Documents
10-01-2025

SECTION NO

DIVISION AND SECTION TITLES

DATE

DIVISION 26 – ELECTRICAL

26 05 11

26 05 19

26 05 26

26 05 33

26 24 16

26 27 26

26 29 21

26 43 13

Requirements for Electrical Installations
Low-Voltage Electrical Power Conductors and Cables
Grounding and Bonding for Electrical Systems
Raceway and Boxes for Electrical Systems
Panelboards
Wiring Devices
Enclosed Switches and Circuit Breakers
Surge Protective Devices

11-22
11-22
11-22
11-22
11-22
11-22

The beginning of the document. Download the full file to read on.

Other documents in this bid