Attachment 1: FALCONS Government Performance Specification
Updated
A PDF document (760 KB) attached to ACC-DTA Commercial Solutions Opening (CSO), from the Department of the Army. Due Jan 8, 2029, 11:59 PM (UTC-5).
File name: Attachment 1 - FALCONS Government Performance Specification.pdf
The full file is for paid members, or buy this bid alone.
Preview
CUI
Instructions:
27 May 2026
MIL-PRF-A3315473
Revision - 1
This document is based on the FALCONS performance specification (P-Spec). The Government has determined there is potential for deviation from the performance specification to more easily and more cost effectively acquire a FALCONS system. As part of the Commercial Solutions Opening (CSO), vendors are invited to modify the specification and propose build product against their version of the modified specification.
This document provides the base specification and, in select areas, commentary on the Government’s thoughts on the requirement. Vendors should use this information as part of the modification process to ensure they are aligned with the Government’s needs and increase the likelihood of selection. All REQUIRED specifications are annotated in red and may have amplifying comments in blue. Commentary is highlighted in BLUE text starting with “// CSO” at the beginning of each commentary paragraph. These comments are provided solely as guidance for assessing the technical viability of the proposed solution.
The Government intends to receive proposals that meet, at a minimum, the criteria established in this guidance. Proposed solutions will be evaluated based on performance, demonstrated capabilities against the full specifications, and operation effectiveness. The Government provides this guidance to assist vendors; however, vendors are expected to meet the minimum criteria and will be assessed as to how well they satisfy, partially satisfy or do not satisfy all specifications.
CUI
CUI
27 May 2026
MIL-PRF-A3315473
Revision - 1
Performance Specification
For
Future Advanced Long-range Common Optical / Netted-fires Sensor (FALCONS) Rapid Prototyping Initiative
27 May 2026
Prepared by:
Product Manager Ground Sensors
Controlled by: PM Ground Sensors
CUI Categories: CTI, PROCURE
Distribution Statement: D
POC: Christopher Byers, 520-673-4805
RONNIE L. BUSH
LTC, LG
Product Manager Ground Sensors
Warning – This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.) as amended. Violations of these export laws are subject to severe criminal penalties. Dissemination in Accordance with provisions of the DoD Directive 5230.25
CUI
CUI
1. SCOPE
27 May 2026
MIL-PRF-A3315473
Revision - 1
This Performance Specification (P-SPEC) describes the specifications for the Future Advanced Long-range
The beginning of the document. Download the full file to read on.
Other documents in this bid
- ACC DTA GROUND MANEUVER CSO
- ACC DTA GROUND MANEUVER CSO Amendment 1
- ACC DTA GROUND MANEUVER CSO Amendment 2
- ACC DTA GROUND MANEUVER CSO Amendment 4
- ACC DTA GROUND MANEUVER CSO Amendment 5
- ACC DTA GROUND MANEUVER CSO Amendment 6
- ACC DTA GROUND MANEUVER CSO Amendment 7
- ACC DTA GROUND MANEUVER CSO Amendment 8
- ACC DTA GROUND MANEUVER CSO Amendment 9
- ACC DTA GROUND MANEUVER CSO Amendment 10
- ACC DTA GROUND MANEUVER CSO Amendment 11
- ACC DTA GROUND MANEUVER CSO Amendment 12