Attachment 1: Manufacturing Readiness Level Deskbook V2
Updated
A Word document (740 KB) attached to Jpeo-Cbrnd CWMD BOTAA-24-01, from the Department of the Army. Due Feb 7, 2029, 12:00 AM (UTC-5).
File name: ATTACHMENT 0001 Manufacturing Readiness Level Deskbook V2_May 2011.docx
The full file is for paid members, or buy this bid alone.
Preview
Manufacturing Readiness Level (MRL) Deskbook
2679482193591
Version 2.0
May, 2011
Prepared by the
OSD Manufacturing Technology Program
In collaboration with
The Joint Service/Industry MRL Working Group
This document is not a DOD requirement and is being offered as a Best Practice
Introduction1-1
Manufacturing Risks Recognized in Policy1-1
Guidance Issued in Support of Policy1-3
Manufacturing-Related Success Criteria Established for Technology Development and Acquisition Strategies1-3 Manufacturing-Related Success Criteria Established for Systems Engineering Reviews1-4 Overarching Best Practices for Complying with Policy and Guidance1-6 Purpose and Organization of this Document1-9
Manufacturing Readiness Levels2-1
Introduction2-1
TRLs and Their Relationship to MRLs2-1
Manufacturing Readiness Level Definitions2-2
Definition of Terms2-5
MRL Threads and Sub-Threads2-8
MRLs and the Acquisition Management System3-1
Introduction3-1
Manufacturing Readiness During Pre-Systems Acquisition3-2 Materiel Solution Analysis Phase3-3
Technology Development Phase3-5
Manufacturing Readiness During Systems Acquisition3-7
Engineering and Manufacturing Development Phase3-8
Production and Devleopment Phase3-10
The Process for Conducting Assessments of Manufacturing Readiness4-1 Introduction4-1
Determine Initial Assessment Scope4-2
Determine Assessment Taxonomy and Schedule4-4
Form and Orient Assessment Team4-5
Orient Contractors Being Assessed4-7
Request Contractors Perform Self Assessment4-8
Set Agenda for Site Visits4-8
Conduct the Assessment of Manufacturing Readiness4-9
Review the Self Assessment4-9
Conduct Assessment4-9
Complete the Assessment4-11
Prepare the Assessment Report4-11
Manufacturing Maturation Plans and Risk Management5-1
Introduction5-1
Development of a Manufacturing Maturation Plan5-2
Risk Management Best Practices5-3
Applying MRLs in Contract Language6-1
Introduction6-1
Strategies for Competitive RFP Language6-1
Manufacturing Readiness RFP Language for Source Selection6-2 SOO Language for All RFPs6-3
SOW Language for Contracts6-4
Other Deliverables6-4
APPENDICES
Detailed MRL Definitions (Threads Matrix)A-1
LIST OF FIGURES
Figure 3-1. Relationship of MRLs to System Milestones, TRLs, and Technical Reviews3-2 Figure 4-1. Sample Process Flow for Conducting an Assessment of Manufacturing Readiness4-1
LIST OF TABLES
Table 4-1 Example of Added Detail Derived from Site Visits4-10
The beginning of the document. Download the full file to read on.