Attachment 1: Performance Work Statement
Updated
A PDF document (111 KB) attached to USSPACECOM Portable Restroom Rental and Maintenance, from the Department of the Navy. Due Nov 10, 2026, 2:00 PM (UTC-8).
File name: Attachment 01 Performance Work Statement (PWS).pdf
The full file is for paid members, or buy this bid alone.
Preview
PERFORMANCE WORK STATEMENT
CONTRACT: TBD
TASK ORDER: TBD
DATE: 10/15/2026
TITLE: Portable Restroom Rental and Maintenance Services Incumbent Contract: N66004125P6020
1.0 SCOPE
The scope of this effort is to procure portable restroom services for the 2515 Aviation Way location in support of the ongoing NIWC Pacific support of the command-and-control facility (C2F) in the Colorado Springs, CO area. The scope also includes maintenance and servicing of portable restrooms at the specified location for the duration of this requirement. This is a severable support service.
2.0 TECHNICAL REQUIREMENTS
One (1) portable restroom as described below; the contractor shall be required to do the following: - Initial delivery and set up the portable restrooms
Approximate or similar to: Height:11’6”, Width: 8’6”, Length: 12-18’, - Approximately 3-4 Total Stations, Women’s: 1-3 Stations, 1-2 sink(s), Men’s Room: 1-3 stations, 1-2 sink(s)
- Power will be provided but water or sewer will not be accessible. - Maintain and clean portable restrooms on a weekly basis (2 times per week) to include pumping of grey/ black water, refilling clean water, cleaning interior of the restrooms and restocking of toilet paper, paper towels, and soap as needed.
- Climate control
- Flushing capability
- Sink function
- Independent water supply, as tie in to existing water supply on site will not be available at any point during the period of performance
The portable restroom will be located at 2515 Aviation Way, Colorado Springs, CO 80916.
3.0 PERFORMANCE REQUIREMENT SUMMARY
3.1
Performance Objectives
• Set up and installation of portable restroom
• Weekly cleaning and servicing of portable restroom (approximately two times per week) to include pumping grey and black water tanks.
3.2
Performance Standards
• Provide completed setup and installation of portable restroom with 14 business days of award
• Complete weekly servicing and clean up services timely as scheduled.
3.3
Acceptable Quality Levels (AQLs)
• Monthly service log provided timely to COR for weekly service appointment completion.
The beginning of the document. Download the full file to read on.