Attachment 1: Performance Work Statement SAG UWILD
Updated
A PDF document (170 KB) attached to Underwater Inspection in Lieu of Dry-docking (UWILD) of the USNS SACAGAWEA, from the Department of the Navy. Due Oct 26, 2026, 5:00 PM (UTC-4).
File name: Attachment 1 - PWS SAG UWILD.pdf
The full file is for paid members, or buy this bid alone.
Preview
USNS SACAGAWEA
( TAKE-02 )
DRYDOCKING
ITEM NO. SOR 27-026
CATEGORY "A"
TAKE-CCSI-UNDERWATER INSPECTION IN
LIEU OF DRYDOCKING (UWILD) (5 YR)
1.0
CONTRACT NO. XXXX-XXX
2026-08-22
Fulcher, Lee
ABSTRACT
The purpose of this item is to conduct an Underwater
Inspection in Lieu of Dry-docking (UWILD) as an alternate to the Dry-docking Survey.
2.0
REFERENCES
NOTE: PPE verify and update references as required for the applicable vessel prior to submission.
3.0
2.1
NAVSEA Drawing No. 801-8388071, Capacity Plan
2.2
NAVSEA Drawing No. 801-8388177, Docking Plan
2.3
NAVSEA Drawing No. 085-7488873, Shell Expansion
2.4
NAVSEA Drawing No. 085-7488875, Scantling Plan Decks
and Profiles
2.5
NAVSEA Drawing No. 085-7488876, Scantling Plan Sections
ITEM LOCATION/DESCRIPTION
NOTE: PPE verify and update location, description (Nomenclature, Manufacturer, Model, Serial number) and quantities as required for the applicable vessel prior to submission.
3.1
Location/Quantity
3.1.1
Locations: Underwater hull
3.1.2
Quantity: One
3.2
Item Description/Manufacturer’s Data
Vessel length: 688 ft 11 in
Vessel breadth: 654 ft
Vessel draft (fwd): 22 ft 10 in
0952 - 1
USNS SACAGAWEA
( TAKE-02 )
DRYDOCKING
ITEM NO. SOR 27-026
CATEGORY "A"
TAKE-CCSI-UNDERWATER INSPECTION IN
LIEU OF DRYDOCKING (UWILD) (5 YR)
CONTRACT NO. XXXX-XXX
2026-08-22
Fulcher, Lee
Vessel draft (aft): 27 ft 9 in
# of Rudders One
# of Propellers One
4.0
GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICE: None
5.0
NOTES
5.1 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs including but not limited to GTRs 1 through 7, 22, 23, 24, 28, and 29.
5.2 This work item is applicable to vessels who have
approval from ABS to conduct ABS Rules for Survey After Construction, Part 7, Appendix, Section 1, Underwater
Inspections in Lieu of Drydocking Surveys. If a vessel has any outstanding recommendations for repairs to the propeller, rudder, stern frame, underwater structure, or sea valves it may not be eligible for UWILD.
5.3 THIS SHIP CONTAINS HIGH VOLTAGE (HV) ELECTRICAL
SYSTEMS. OBEY ALL POSTED AND VERBAL INSTRUCTIONS REGARDING
SAFETY AND EXCLUSION FROM HIGH VOLTAGE AREAS. AT NO TIME
APPROACH, WORK ON, OR ENTER A HIGH VOLTAGE AREA WITHOUT PROPER
AUTHORIZATION.
5.4 THE T-AKE CLASS ELECTRICAL COLOR CODING DOES NOT