USNS SACAGAWEA

( TAKE-02 )

DRYDOCKING

ITEM NO. SOR 27-026

CATEGORY "A"

TAKE-CCSI-UNDERWATER INSPECTION IN

LIEU OF DRYDOCKING (UWILD) (5 YR)

1.0

CONTRACT NO. XXXX-XXX

2026-08-22
Fulcher, Lee

ABSTRACT

The purpose of this item is to conduct an Underwater
Inspection in Lieu of Dry-docking (UWILD) as an alternate to the Dry-docking Survey.
2.0

REFERENCES

NOTE: PPE verify and update references as required for the applicable vessel prior to submission.

3.0

2.1

NAVSEA Drawing No. 801-8388071, Capacity Plan

2.2

NAVSEA Drawing No. 801-8388177, Docking Plan

2.3

NAVSEA Drawing No. 085-7488873, Shell Expansion

2.4

NAVSEA Drawing No. 085-7488875, Scantling Plan Decks
and Profiles

2.5

NAVSEA Drawing No. 085-7488876, Scantling Plan Sections

ITEM LOCATION/DESCRIPTION

NOTE: PPE verify and update location, description (Nomenclature, Manufacturer, Model, Serial number) and quantities as required for the applicable vessel prior to submission.
3.1

Location/Quantity

3.1.1

Locations: Underwater hull

3.1.2

Quantity: One

3.2

Item Description/Manufacturer’s Data
Vessel length: 688 ft 11 in
Vessel breadth: 654 ft
Vessel draft (fwd): 22 ft 10 in

0952 - 1

USNS SACAGAWEA

( TAKE-02 )

DRYDOCKING

ITEM NO. SOR 27-026

CATEGORY "A"

TAKE-CCSI-UNDERWATER INSPECTION IN

LIEU OF DRYDOCKING (UWILD) (5 YR)

CONTRACT NO. XXXX-XXX

2026-08-22
Fulcher, Lee

Vessel draft (aft): 27 ft 9 in
# of Rudders One
# of Propellers One

4.0

GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICE: None

5.0

NOTES

5.1 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs including but not limited to GTRs 1 through 7, 22, 23, 24, 28, and 29.
5.2 This work item is applicable to vessels who have
approval from ABS to conduct ABS Rules for Survey After Construction, Part 7, Appendix, Section 1, Underwater
Inspections in Lieu of Drydocking Surveys. If a vessel has any outstanding recommendations for repairs to the propeller, rudder, stern frame, underwater structure, or sea valves it may not be eligible for UWILD.

5.3 THIS SHIP CONTAINS HIGH VOLTAGE (HV) ELECTRICAL

SYSTEMS. OBEY ALL POSTED AND VERBAL INSTRUCTIONS REGARDING

SAFETY AND EXCLUSION FROM HIGH VOLTAGE AREAS. AT NO TIME

APPROACH, WORK ON, OR ENTER A HIGH VOLTAGE AREA WITHOUT PROPER

AUTHORIZATION.

5.4 THE T-AKE CLASS ELECTRICAL COLOR CODING DOES NOT