Home / DCDO Septic Tank and Sewage Treatment Maintenance / Document

Attachment 1: Performance Work Statement Septic (FY27)

Updated

A PDF document (298 KB) attached to DCDO Septic Tank and Sewage Treatment Maintenance, from the Department of the Air Force. Due Oct 26, 2026, 10:00 AM (UTC+9).

File name: Attachment 1 - PWS Septic (FY27)_pdf.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

PERFORMANCE WORK STATEMENT

FOR

SEPTIC TANK AND SEWAGE SERVICES

TREATMENT PLANT MAINTENANCE SERVICES

Defenses Communication Detachment Okinawa (DCDO)

Kadena Air Base, Japan

06 October 2026

Final Review: QAPC

1. GENERAL INFORMATION

1.1.
SCOPE OF WORK. The contractor will provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to perform Septic Tank and Sewage Treatment Plant Maintenance Services as defined in this Performance Work Statement (PWS) at DCDO, Okinawa, Japan. The contractor will perform to the standards in this contract. The estimated quantities of work are listed in Section 3, Specific Tasks. 1.1.1. The contractor will provide a quarterly report for all work accomplished. This report will be submitted to DCDO's QI at building 2940A 2F, Public Works Office 1.2.
SECURITY REQUIREMENTS. All Contractor employees will obtain the required employee and vehicle passes. The Government will issue badges without charge. 1.2.1. The following special requirements are for work within the fenced operations compound:
1.2.2. Access List. The contractor must furnish an access list to DCDO's Quality Inspector (QI) at least one week prior to starting work. The list will be prepared and submitted in accordance with Section 3. The access list must be on the contractor's letterhead and will include: 1.2.2.1. The contract number, title and completion date. 1.2.2.2. The name and date of birth of each person who will require access to the fenced operations compound during the contract.
1.2.3. ID check. Each worker will be required to present picture identification to the security guard when entering the fenced operations compound. Each ID card will be compared with the access list. The ID card must have the person's picture, name and date of birth. 1.2.4. Vehicles. Only work vehicles required to bring materials to the job site will be permitted to park within the compound. Personally owned vehicles will not be permitted to enter. The following information is required as a minimum:
a) Vehicle make, model, color, year, license number, intended use and registered owner. b) A signed statement, by the vehicle owner, that all required insurance has been purchased and will be valid during the entire contract period. 1.2.5. Availability of buildings. The job site will be made available to the contractor only for the length of time required to expeditiously complete the work. 1.2.6. Neither the Contractor nor any of its employees shall disclose or cause to be disseminated

The beginning of the document. Download the full file to read on.

Other documents in this bid