Attachment 1: PROJECT LISTINGS
Updated
A Word document (38 KB) attached to MACH1 AOI FA8903-27-OT-001 Horizontal Airfield Infrastructure, from the Department of the Air Force. Due Jan 15, 2027, 10:00 AM (UTC-6).
File name: ATTACHMENT_1__PROJECT_LISTINGS.docx
The full file is for paid members, or buy this bid alone.
Preview
1. DAVIS-MONTHAN AFB — Project # FBNV190001 Repair Runway 12/30 Scope of Work Summary: Repair Runway 13/31 by full-depth replacement of the runway asphalt pavement sections with Portland Cement Concrete (PCC) (approximately 166,417 SY), replacing various distressed PCC panels, and performing routine maintenance of the PCC at runway ends. Replace asphalt shoulders with new asphalt (approximately 54,472 SY). Replace asphalt overruns (approximately 46,200 SY) with new concrete extending 100 feet on either side of the arresting system cable and new asphalt for the remainder of the overruns. All work to be designed in accordance with UFC 3-260-01 and UFC 3-260-02, integrating sustainable principles in accordance with UFC 1-200-02. 2. KIRTLAND AFB — Project # MHMV190054 Repair Apron C (SUS) Scope of Work Summary: Full-depth PCC reconstruction of Apron C consisting of 16 inches of PCC and 8 inches of aggregate base course over compacted subgrade across approximately 63,200 SM (680,000 SF) based on medium-load airfield and Type B traffic area design. Reinforce undersize and odd-shaped edge slabs. Install 15 lighting masts with mast-mounted fixtures and 10 hangar-mounted lighting fixtures for apron use and security. Install replacement aircraft tie-downs, aircraft grounding systems, and supporting utilities.
3. LAUGHLIN AFB — Project # MXDP161018 REPAIR APRON ROWS E, F, G, AND H
Scope of Work Summary: Provide all labor, material, and equipment for construction in apron areas E, F, G, and H consisting of: remove and replace all existing concrete, base material, and subbase material (approximately 36,337 SF). Compact base and subbase material to standards prescribed. Restripe to meet standards prescribed. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02.
4. LAUGHLIN AFB — Project # MXDP161004 REPAIR CENTER RUNWAY, 13C/31C
Scope of Work Summary: Provide all labor, materials and equipment necessary to repair Runway 13C/31C as required (8,852 feet by 150 feet, totaling approximately 1,327,800 SF). The work will include milling, grading and localized structural distress correction, overlay, and full depth crack sealant as required in accordance with UFC 3-260-01, UFC 3-260-02, FAA AC 150/5340-1M regarding pavement markings, and UFC 1-200-02 sustainable principles. 5. TINKER AFB — Project # WWYK140085A (DD 1391 Child Project # WWYK140085) Repair Airfield Apron, AWACS Apron P3
The beginning of the document. Download the full file to read on.