Attachment 1: Project Specifications List
Updated
A PDF document (88 KB) attached to Cripple Creek Veg Management Roads Reconstruction, from the Forest Service. Due Dec 4, 2026, 5:00 PM (UTC-8).
File name: Attachment 1 Project Specifications List.pdf
The full file is for paid members, or buy this bid alone.
Preview
FP-14 SPECIFICATIONS FOR CRIPPLE CREEK VEGETATION MANAGEMENT ROADS
RECONSTRUCTION
All specifications not included in the specifications listing, but referenced by listed specifications, are applicable. The supplemental specifications shown on the specification list are physically attached. Section 100 through 149 of the Standard Specifications and all other Standard or supplemental specifications shown in the specification listing are applicable to this contract.
Spec
Title
Revised
Preface
6/28/2026
Terms, Format, and Definitions
FP14
101.01
Meaning of Terms
11/9/2016
101.03
Abbreviations
11/9/2016
101.04
Definitions
1/22/2020
Delete Section 102
11/9/2016
Scope of Work
FP14
Deletion Subsections 103.02, 103.03, 103.04, 103.05
11/9/2016
Control of Work
FP14
Delete Subsections 104.01, 104.02 104.04
11/9/2016
Use of Roads by Contractor
11/9/2016
104.06
Control of Material
FP14
105.05
Use of Material in the Work
6/29/2020
Acceptance of Work
FP14
Conformity with Contract Requirements
7/18/2017
106.01
106.02
Visual Inspection
11/9/2016
Legal Regulations and Responsibility to the Public
FP14
Delete Subsection 107.05
7/18/2017
Delete Section 108
11/9/2016
Measurement and Payment
FP14
Delete Subsections 109.06, 109.07, 109.08, 109.09
11/9/2016
Measurement Terms and Definitions
11/9/2016
109.02
Mobilization
FP14
Contractor Quality Control
FP14
153.02
Qualifications
11/1/2016
Records and Control Charts
11/1/2016
153.07
Delete Section 155
11/9/2016
Soil Erosion and Sediment Control
FP14
157.04
General
11/1/2016
Clearing and Grubbing
FP14
201.06
Disposal
2/22/2018
Removal of Structures and Obstructions
FP14
Delete Section 204
11/4/2016
Structure Excavation and Backfill
FP14
209.1
Compacting
7/17/2017
Replace 212 with 249 Low Volume Road Construction
3/9/2020
Untreated Aggregate Courses
FP14
301.03
General
7/17/2017
Minor Crushed Aggregate
FP14
302.04
Placing Crushed Aggregate
7/18/2017
302.05
Compacting and Finishing Crushed Aggregate
6/11/2020
Replace 625
5/4/2022
Aggregate
FP14
70305
Subbase, Base, Surface Course, and Screened Aggregate
3/17/2021
The beginning of the document. Download the full file to read on.