Purchase Description
MJU-75B Impulse Cartridge Cup

28 October 2026

FAT QTY – 10 EA

Production QTY – 28,215 EA
Impulse Cartridge Cup, Coined Point per DWG 201719312 manufactured from Impulse Cartridge Cup, Blank Point DWG 201719312 using Coining Tooling per DWG 201719314 -

-

•

Material: Aluminum Alloy 6061-T6, ASTM B211, Cold-finished Bar Dimensions apply prior to Coining Operation as specified in 201719312 201719314 Coining Tooling has been found to provide satisfactory coining feature in the cup.
Annealing parameters: A. Anneal machined part to 760 degrees F +/- 10 F for 2-3 hours. B. Cool part at a rate of 50 degrees F per hour until temp is below 500 degrees F The center of this feature is .012 x .002 prior to coining. PRIOR TO ACCEPTANCE OF COINED POINT, IMPULSE CARTRIDGE CUP (201716312),

A REPRESENTATIVE SAMPLE SHALL BE HYDROSTATICALLY BURST TESTED AND

OBTAIN A BURST PRESSURE IN THE RANGE OF 1,000 ± 200 PSI, ACHIEVED AT A

RATE OF 100-400 PSI/SEC.

o A. 201719315 HYDROSTATIC BURST FIXTURE HAS BEEN FOUND TO PROVIDE A

o SATISFACTORY BURSTING OF COINED CUP.
o **The Contractor will be required to submit their burster testing procedure to CAAA for approval as part of the first article testing (FAT) approval. o **The Government reserves the right to travel to the Contractor’s facility to oversee and validate the manufacturing and testing process as part of the FAT. The Contractor shall provide the Government notice at least 14 calendar days in advance of first article testing, to provide sufficient travel planning. All deliveries must include material certs.

RDD 30 DEC 2026

Delivery schedule:
o FAT QTY 10 delivered 6 weeks after contract award.
o Production QTY completed NLT 22 weeks after FAT approval. o Multiple deliveries requested.
▪ 14,000 delivered 11 weeks after FAT approval
▪ 14,215 delivered 22 weeks after FAT approval

CAAA will accept earlier deliveries at no additional cost to the government.

•
•

All deliveries require material certifications/ certificate of conformance IAW CAAA Form 702-37.
BOL / shipping information must contain applicable contract number and applicable PR document number.

Please ship all deliveries to:
Crane Army Ammunition Activity
300 Highway 361
Building 148
Crane, IN 47522

* Receiving hours are Monday through Thursday, 0630-1530. * Friday deliveries are only accepted by prescheduled appointment, Please call