Attachment 1: Revised Draft Division 01 Redline
Updated
A PDF document (1.4 MB) attached to Industry Feedback Requested: Fort Worth District Draft Division 01 Specification for Other Transaction Authority Process, from the Department of the Army. Due Nov 19, 2026, 5:00 PM (UTC-6).
File name: Attachment 1 Revised Draft Division 01 Redline.pdf
The full file is for paid members, or buy this bid alone.
Preview
Final OTA Division 01
SECTION 01 00 00.00 44
[DESIGN AND] CONSTRUCTION SCHEDULE
PART 1
1.1
GENERAL
REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1
1.2
(2024) Safety -- Safety and Occupational
Health (SOH) Requirements
SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" [or "S" ]classification are for Design-Builder Quality Control approval. Submittals not having a "G" por "S" ]classification are for information only. When used, a code following the "G" classification identifies the office that reviews the submittal for the Government. Submit the following in accordance with
Section 01 33 00.00 61 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Field Office Overhead
Accounting Practice
Delegation Of Authority
Progress and Completion Pictures
High-Resolution Exterior Panoramic Photographs
1.3
SCHEDULE
Commence, prosecute, and complete the work under this [Agreement] in accordance with the following schedule and [the Articles of the Agreement]:
Item of Work
Commencement of
Work
(Calendar days)
SECTION 01 00 00.00 44
Completion of
Work
(Calendar
days)
Liquidated
Damages
per
calendar
days
Final OTA Division 01
(1)
All work, including O&M
Manuals and Final
Record Drawings,
[except]
[establishment of
turf][ and]
[landscaping]
[Upon receipt of
Notice to
(1)
Completion of all
[design and]
construction work
[including][except]
Establishment of
Turf and
Landscaping
[Upon receipt of
Notice to
(2)
See [form SF
(_)
See [form SF
( )
See [form SF
( )
[Option No. [__]]
*
( )
Establishment of
Turf
*
*
( )
Landscaping
*
*
$
( )
O & M Manuals
**
**
None
( )
Final Record
Drawings
***
***
None
[
NOTE: All work on this project shall be completed within the number of calendar days stated in [Item of Work (1)][Items of Work ([__])] above, inclusive of all review periods and Government phasing requirements specified. If the Government accepts a proposal for a
SECTION 01 00 00.00 44
Final OTA Division 01
completion period of lesser duration, and such proposal alters the time periods for review and phasing, the [Agreement] shall be read to include the original periods for review and phasing. If a completion period of lesser duration is proposed and accepted by the Government,
The beginning of the document. Download the full file to read on.