Attachment 1: Specifications 100p
Updated
A PDF document (7.2 MB) attached to BRCA 310427 Southbound Shuttle Stop, from the National Park Service. Due Nov 3, 2026, 1:00 PM (UTC-5).
File name: B08_Att_01_BRCA310427_20251223_Specifications_100p.pdf
The full file is for paid members, or buy this bid alone.
Preview
BRYCE CANYON NATIONAL PARK
GARFIELD COUNTY, UTAH
SHUTTLE BUS STOPS & PEDESTRIAN CROSSWALK
BRCA
PMIS Number 310427
PROJECT SPECIFICATIONS
(100% Design Submittal)
NATIONAL PARK SERVICE (NPS)
DENVER SERVICE CENTER (DSC)
December 2025
12/23/2025
BRCA 310427
DIVISION 01: GENERAL REQUIREMENTS
01 11 00
Summary of Work
01 26 01
Contract Modification Procedures
01 27 00
Definition of Contract Line Items
Supplement: Contract Price Schedule
01 31 00
Project Management and Coordination
01 32 16
Construction Schedule
01 32 33
Photo Documentation
01 33 23
Submittal Procedures
Supplement: Submittal List
01 35 23
Safety Requirements
01 40 00
Quality Requirements
01 42 00
Reference Standards
01 50 00
Temporary Facilities and Controls
01 57 19.12 Noise and Acoustics Management
01 57 23
Temporary Storm Water Pollution Prevention
01 67 00
Product Requirements
Supplement: Affirmative Procurement Reporting Form
01 73 29
Cutting and Patching
01 73 40
Execution
01 74 19
Construction Waste Management and Disposal
01 77 00
Closeout Procedures
Division 01 Supplements: Project Waste Management Plan Worksheet Closeout and Operation and Maintenance Requirements
DIVISION 02: EXISTING CONDITIONS
02 41 00
Demolition and Salvage
DIVISION 03: CONCRETE
03 10 00
Concrete Forming and Accessories
03 15 00
Concrete Joints and Accessories
03 21 00
Steel Reinforcement
03 30 00
Cast In Place Concrete
Supplement: Concrete Mix Design
03 39 00
Concrete Curing
03 63 00
Concrete Doweling
DIVISION 04: Masonry
04 43 00
Stone Masonry
DIVISION 05: METALS
05 50 00
Metal Fabrications
DIVISION 06: WOOD, PLASTICS & COMPOSITES
06 10 53
Miscellaneous Rough Carpentry
DIVISION 07: THERMAL & MOISTURE PROTECTION
07 41 13.16 Standing Seam Sheet Metal Roof Panels
07 92 00
Joint Sealants
DIVISION 09: FINISHES
09 91 13
Exterior Painting
09 93 00
Staining and Transparent Finishing
DIVISION 10: SPECIALTIES
10 14 00
Signage
DIVISION 26: ELECTRICAL
26 41 13
Lightning Protection System
DIVISION 31: EARTHWORK
31 10 00
Site Clearing
31 23 00
Excavation and Fill
31 37 00
Riprap
DIVISION 32: EXTERIOR IMPROVEMENTS
32 11 23
Aggregate Base Course
32 12 13.13 Asphalt Prime Coat / Tack Coat
32 12 16
Minor Asphalt Pavement
32 13 13
Concrete Paving
32 17 23
Pavement Markings
32 31 26
Wood Fences
32 33 00
Site Furnishings
32 91 13
Soil Preparation
32 92 00
Turf and Grasses
DIVISION 33: UTILITIES
33 41 01
Storm Drain Piping
APPENDICES
Appendix A Bryce Canyon National Park Visitor Center Shuttle Stops Final Geotechnical Engineering and Pavement Report, Yeh and Associates, Inc., January 28, 2025 End of Table of Contents
SECTION 01 11 00 - SUMMARY OF WORK
The beginning of the document. Download the full file to read on.