Home / Construct North Unit Visitor Center at BADL / Document

Attachment 1: Specifications - 1262

Updated

A PDF document (12.2 MB) attached to Construct North Unit Visitor Center at BADL, from the National Park Service. Due Nov 3, 2026, 12:00 PM (UTC-6).

File name: Attachment_1_-_Specifications_-_1262.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

BADLANDS NATIONAL PARK

INTERIOR, SOUTH DAKOTA

CONSTRUCT NORTH UNIT VISITOR CENTER

PMIS 310747

Drawing No: 80112

PROJECT SPECIFICATIONS

NATIONAL PARK SERVICE

7/9/2025

Div. 1 V. 2023-11-11
Page | 1

A R C H IT E C T

RE

UT

A

14417

STEPHEN R. SMITH

SO

G IS T E R E D

O F E S S IO N A

G . NO
.
RE

L

PR

H DA K

7/9/25

OT

I HEREBY CERTIFY THAT THIS ENGINEERING

DOCUMENT WAS PREPARED BY ME OR UNDER MY

DIRECT PERSONAL SUPERVISION AND THAT I AM A

DULY LICENSED PROFESSIONAL ARCHITECT UNDER

THE LAWS OF THE STATE OF SOUTH DAKOTA

STEPHEN R. SMITH, AIA

9 JULY 2025

ARCHITECT

DATE

SPECIFICATION DIVISIONS COVERED BY THIS SEAL:

0, 1, 2, 3, 5, 6, 7, 8, 9, 10, 12

I HEREBY CERTIFY THAT THIS ENGINEERING

DOCUMENT WAS PREPARED BY ME OR UNDER MY

DIRECT PERSONAL SUPERVISION AND THAT I AM A

DULY LICENSED PROFESSIONAL ENGINEER UNDER

THE LAWS OF THE STATE OF SOUTH DAKOTA

7/9/25

STEVEN M. NASS, PE SE

9 JULY 2025

STRUCTURAL ENGINEER

DATE

SPECIFICATION DIVISIONS COVERED BY THIS SEAL:

3, 5

I HEREBY CERTIFY THAT THIS ENGINEERING

DOCUMENT WAS PREPARED BY ME OR UNDER MY

DIRECT PERSONAL SUPERVISION AND THAT I AM A

DULY LICENSED PROFESSIONAL ENGINEER UNDER

THE LAWS OF THE STATE OF SOUTH DAKOTA

BRIAN A. HADFIELD, PE

9 JULY 2025

FIRE PROTECTION ENGINEER

DATE

SPECIFICATION DIVISIONS COVERED BY THIS SEAL:

I HEREBY CERTIFY THAT THIS ENGINEERING

DOCUMENT WAS PREPARED BY ME OR UNDER MY

DIRECT PERSONAL SUPERVISION AND THAT I AM A

DULY LICENSED PROFESSIONAL ENGINEER UNDER

THE LAWS OF THE STATE OF SOUTH DAKOTA

BRIAN A. HADFIELD, PE

9 JULY 2025

MECHANICAL ENGINEER

DATE

SPECIFICATION DIVISIONS COVERED BY THIS SEAL:

OFESSION

PR
A
D
.
N
G
O.
RE

L

SO

UT

I HEREBY CERTIFY THAT THIS ENGINEERING

DOCUMENT WAS PREPARED BY ME OR UNDER MY

DIRECT PERSONAL SUPERVISION AND THAT I AM A

DULY LICENSED PROFESSIONAL ENGINEER UNDER

THE LAWS OF THE STATE OF SOUTH DAKOTA

KENNETH J. MORGAN, PE

9 JULY 2025

ELECTRICAL ENGINEER

DATE

TA

10220
KENNETH J.

MORGAN

GINEER

EN

REGISTE

RE

22, 23

H DAKO

SPECIFICATION DIVISIONS COVERED BY THIS SEAL:

26, 27, 28

DIVISION 01 - GENERAL REQUIREMENTS

Section 01 10 00 - Division 01 Short Form General Requirements

DIVISON 02 – EXISTING CONDITIONS

Section 02 41 00 - DEMOLITION

DIVISON 03 - CONCRETE

Section 03 30 00 - CAST-IN-PLACE CONCRETE

Section 03 35 11 - CONCRETE FLOOR FINISHES

Section 03 36 16 - REACTIVE CHEMICAL CONCRETE STAIN

Section 03 41 00 - STRUCTURAL PRECAST CONCRETE

Section 03 46 00 - PRECAST CONCRETE WALL PANELS

DIVISON 05 - METALS

Section 05 10 00 - STRUCTURAL STEEL

Section 05 30 00 - METAL DECKING

Section 05 44 00 - PRE-ENGINEERED AND PREFABRICATED COLD-FORMED STEEL TRUSSES

The beginning of the document. Download the full file to read on.

Other documents in this bid