GEOTHERMAL HVAC SYSTEM FOR

JACKSON SHRINE DEATH SITE

FREDERICKSBURG & SPOTSYLANIA NATIONAL MILITARY PARK

FRSP PMIS NO. 304741

DIVISION ONE &

TECHNICAL

SPECIFICATIONS

NATIONAL PARK SERVICE

DENVER SERVICE CENTER

March 2025

CONSTRUCTION DOCUMENTS

FRSP 304741

DIVISION 01: GENERAL REQUIREMENTS

01 11 00

Summary of Work

01 26 01

Contract Modification Procedures

01 27 00

Definition of Contract Line Items

01 31 00

Project Management and Coordination

01 32 16

Construction Schedule

01 32 33

Photographic Documentation

01 33 23

Submittal Procedures

01 35 13.22 Archeological Protection

01 35 23

Safety Requirements

01 35 91

Historic Preservation Treatment Procedures

01 40 00

Quality Requirements

01 42 00

Reference Standards

01 50 00

Temporary Facilities and Controls

01 56 39

Tree Retention and Protection
01 57 19.11 Indoor Air Quality (IAQ) Management
01 57 19.12 Noise and Acoustics Management

01 57 23

Under-an-Acre Pollution Prevention (UPPP)

01 67 00

Product Requirements

01 73 29

Cutting and Patching

01 73 40

Execution

01 74 19

Construction Waste Management and Disposal

01 77 00

Closeout Procedures

01 78 23

Operation and Maintenance (O&M) Data

01 79 00

Demonstration & Training

01 81 13

Sustainable Design Requirements- Non-LEED™ Projects

01 91 14

Total Building Commissioning

DIVISION 02: EXISTING CONDITIONS

02 41 19

Selective Demolition

02 73 29

Cutting and Patching

DIVISION 9: FINISHES

09 24 00

Cement Plastering

09 29 00

Gypsum Board

09 91 23

Interior Painting

DIVISION 23: HEATING, VENTILATING, AND AIR CONDITIONING

23 05 00

Common Work Results for HVAC

23 05 13

Common Motor Requirements for HVAC Equipment

23 05 19

Meters and Gauges for HVAC Piping

22 05 23

General Duty Valves for HVAC Piping

23 05 29

Hangers and Supports for HVAC Piping

23 05 48

Vibration and Seismic Controls For HVAC

23 05 53

Identification for HVAC Piping and Equipment

23 05 93

Testing, Adjusting, and Balancing for HVAC

23 07 13

Duct Insulation

23 07 19

HVAC Piping Insulation

23 08 00

Commissioning of Mechanical Systems

23 21 13

Hydronic Piping

23 21 16

Hydronic Piping Specialties

23 21 23

Hydronic Pumps

23 31 13

Metal Ducts

23 33 00

Air Duct Accessories

23 33 46

Flexible Ducts

23 37 13

Diffusers, Registers, and Grilles

23 57 33

Ground Heat Exchangers

23 57 33.16

Thermal Enhanced Grout

23 57 33.19

Grouting Vertical Loops

23 81 46

Water Source Heat Pumps

23 82 39.19

Wall Unit Heaters

DIVISION 26: ELECTRICAL

26 05 00

Common Work Results for Electrical

26 05 19

Low-Voltage Electrical Power Conductors and Cables

26 05 26

Grounding and Bonding for Electrical Systems

26 05 29

Hangers and Supports for Electrical Systems