STATEMENT OF WORK
Spent Fuel Shipment
Requesting Lab: National Institute of Standards & Technology Center for Neutron Research (NCNR)
BACKGROUND
The National Institute of Standards and Technology (NIST) Center for Neutron Research (NCNR) owns and operates a 20 MW test reactor called the National Bureau of Standards Reactor (NBSR). The NBSR is located on the NIST campus in Gaithersburg, Maryland, USA. The NBSR is a heavy water cooled and moderated reactor. The mission of the NBSR is to provide neutrons for world class measurements supporting the industrial, academic, and government needs of the United States. The NBSR is fueled by 30 highly enriched uranium fuel elements. During the course of a year, the NBSR produces approximately 28 spent fuel elements. The fuel elements are made up of U3O8-Al Materials Testing Reactor (MTR) type dispersion fuel plates. There are two, 13-inch-tall stacks of fuel plates lodged in every fuel element with a gap of six inches between them. The fueled regions can be separated from the rest of the fuel element using an underwater saw to reduce high level radioactive waste shipments. The measurements for each fueled region are 13.5 in x 3.5 in x 3 in. To be in accordance with the Nuclear Regulatory Commission (NRC), NIST is required to transfer its spent fuel to the Department of Energy (DOE) Savannah River Site (SRS) near Aiken, South Carolina.
OBJECTIVE
The goal of this procurement is for a qualified contractor to provide packaging and shipping services for spent fuel elements from the NCNR to DOE-SRS.
SCOPE
The action is for the packaging and shipment of the spent fuel cells in a single cask to the DOE-SRS. All the fuel sections will have been out of the reactor for at least two years. BASE: Packaging and shipment of spent fuel cells to DOE-SRS. OPTION 1: The scope will include an option for a second shipment within 2 years of the initial, base shipment.
REQUIREMENTS
General Requirements
The Contractor shall ensure all communications are on a need-to-know basis and in compliance with 10 CFR 73 requirements.
The Contractor shall ensure all paperwork is properly marked and handled according to pertinent NRC and Department of Transportation (DOT) regulations with copies being limited to only those required to complete the activity.
The Contractor shall submit a firm-fixed price quotation which meets or exceeds the requirements identified in this document. It shall address the required specifications and include descriptive literature, as required, to fully demonstrate how the technical approach will satisfy the task requirements.