Home / Overhaul of Wheel, Landing Gear / Document

Attachment 1: Statement of Work

Updated

A PDF document (1.5 MB) attached to Overhaul of Wheel, Landing Gear, from the US Coast Guard. Due Nov 9, 2026, 12:00 PM (UTC-5).

File name: Attachment 1 - Statement of Work - 70Z03827QH000002.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Attachment 1 - Statement of Work - 70Z03827QH0000002

STATEMENT OF WORK (SOW)

FOR OVERHAUL

1.0 GENERAL

1.1 BACKGROUND

The U.S. Coast Guard (USCG) Aviation Logistics Center (ALC) requires overhaul services for the applicable Part Numbers (P/N), National Stock Numbers (NSN), and quantity estimates as specified on the Schedule of Supplies/Services (Schedule). The Contractor shall be required to overhaul components to be returned to USCG in a ready for issue (RFI) condition per section titled Applicable Documents. The Long-Range Surveillance Product Line Division (LRS) supports the HC-130J aircraft by providing logistics, inventory management, and sustainment support for USCG aviation assets utilized by Air Stations geographically located in and outside the continental United States. As part of this responsibility, the LRS has a requirement for sustainment of numerous components used on the aircraft.

1.2 SCOPE

All overhaul actions shall be In Accordance With (IAW) the applicable technical directive or alternate standard approved in writing by USCG LRS Contracting Officer. Components furnished hereunder shall be returned by the Contractor in an airworthy condition and in all respects suitable for installation on the HC-130J aircraft. Certification and documentation requirements apply. Firm-fixed pricing for overhauls shall be at a fully burdened rate. The Contractor shall supply all parts, labor, and materials required to restore these components to a Ready for Issue (RFI) condition. Incorporation of Service Bulletins (SB) or repairs for Unusual Damage will be priced separately. The technical requirements in the SOW are identified as the minimum acceptable standards of performance to define an operationally effective system. The Contractor must have access to the applicable technical directives cited in paragraph titled Applicable Documents. In addition to these directives, the Contractor must have access to all performance/test/acceptance criteria and necessary data to ensure the items specified in the Schedule are overhauled, calibrated, and operating IAW the applicable technical directives.
The work required by this SOW is not limited to the installation of overhaul kits. The Contractor shall perform a complete overhaul and correct all additional deficiencies discovered during teardown. The work shall include repair of all failed components and include replacement of missing hardware, broken parts, and the removal of any foreign matter or corrosion.

Rev. 5/11/2026

The beginning of the document. Download the full file to read on.

Other documents in this bid