Home / Portable Toilet Services - ZION National Park / Document

Attachment 1: Statement of Work

Updated

A PDF document (140 KB) attached to Portable Toilet Services - ZION National Park, from the Departmental Offices. Due Dec 3, 2026, 12:00 PM (UTC-7).

File name: Attachment_1_-_Statement_of_Work.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

STATEMENT OF WORK

Portable Toilet Placement and Service

ZION NATIONAL PARK

October 30, 2026

I. INTRODUCTION:

The National Park Service has a need to place and service temporary toilet facilities in high visitor use areas to supplement existing restroom facilities. The contractor shall furnish all labor, materials, supplies, and parts to maintain portable toilets in a safe operating condition and in accordance with the specifications outlined in this Statement of Work (SOW).

II. BACKGROUND:

Zion National Park provides access to millions of visitors each year. Due to the ever-increasing number of visitors, it is necessary to supplement existing toilet facilities with portable toilets. This will ensure the health, safety, and enjoyment of the Parks visitors.

III. SPECIFIC TASKS OR REQUIREMENTS:

1) Furnish all labor, materials, and supplies to maintain portable toilets in a safe operating condition and in accordance with the following specifications. Skilled, trained personnel shall be used by the awardee of this contract and supervised by the contractor 2) Maintain the units in a clean, orderly, and sanitary manner. 3) Graffiti or other surface markings shall be removed within 24 hours of notification to the contractor or as soon as identified by the contractor itself. 4) Units shall be free of litter and routinely maintained. 5) Interior surfaces shall be wiped down and sanitized with a disinfectant cleaning product with every service.
6) Units shall be equipped with dual toilet paper dispensers which shall be adequately stocked with each service.
7) Units shall be equipped with wall-mounted waterless hand soap dispensers and shall be adequately stocked with each service.
8) Pumping and servicing of units will be scheduled to maintain the health and safety of the user, per standard commercial practices/frequency.
9) Damaged or deficient units shall be repaired or replaced within 24 hours.

10) Conduct regular inspections and maintenance to ensure units are in good working condition. 11) Contractor shall provide a record of servicing and quantity of use throughout the contract on a quarterly basis by submitting usage reports to the NPS Contracting Officer and Contracting Officer Representative.
12) Contractor shall provide for visitor safety and adhere to all OSHA Standards throughout the performance of the contract.
13) Contractor shall provide a Safety Plan for all operations and a Spill Plan to be reviewed by Park Safety Officer after award of the contract.

The beginning of the document. Download the full file to read on.

Other documents in this bid