Attachment 1: Statement of Work
Updated
A PDF document (1.8 MB) attached to B462 Entryway Carpet Offutt AFB, from the Department of the Air Force. Due Nov 19, 2026, 11:00 AM (UTC-6).
File name: Attachment 1 - Statement of Work - 20260916.pdf
The full file is for paid members, or buy this bid alone.
Preview
Statement of Objectives
Date: 16 September 2026
Project title: B462 Entryway Carpet Replacement and Stripe Repainting Objectives:
The contractor shall remove the existing damaged carpet and residual adhesive in the front entryway of Building 462, prepare the step edge, repaint the white safety stripe, and install a suitable non-slip commercial exterior entry mat so that the entryway is safe, functional, and professionally finished.
General Requirements:
Project includes, but is not limited to, the following work elements. The Contractor shall furnish all required services, labor, tools, material, and equipment necessary to complete the installation and integration of the prime mission equipment in accordance with the approved site design and installation plan. No alterations, additions, or deletions shall be made unless by prior approval of the Contracting Officer (CO). All work will meet the International Building Code, UFC, UFGS, ASME, ASTM, ETL, and any other applicable code requirement. The contractor shall maintain the work site in a clean and orderly manner so that the safest possible site is provided for workers and Air Force members. Work shall be completed in a neat, substantial, and competent manner. Requirements:
1. Demo/remove current carpet:
a. 12’x12’
b. Appropriate removal of adhesive
2. Remove and repaint white step-edge marking:
a. ~60 LF
3. Install: new 10’x12’ non-slip commercial exterior entry mat that matches the existing red color. The shorter length is to prevent weathering on the curb. Additional General Requirements
•
•
•
Ensure all construction meets federal regulations for safety standards. provide 1 year workmanship warranty.
In addition, the Contractor shall be responsible for the following actions: a. Obtaining all necessary security and safety clearances for facilities and personnel. b. Obtaining environmental and life safety approvals.
c. Acquiring all necessary federal, state, local and base environmental and civil engineering permits and approvals.
d. Cleaning-up and restoring the site to its original or better condition within 10 workdays after project completion. This includes removal of any portable offices that may have been used to support implementation of the site design at the base. e. Repairing damage to Government property resulting from contractor activities,
assuring the property is returned to its original or better condition. f. Removing all debris at the end of each shift or more frequently if required to keep the
The beginning of the document. Download the full file to read on.