Attachment 1: Statement of Work
Updated
A PDF document (261 KB) attached to Forest Wide Decommissioning Project, from the Forest Service. Due Nov 30, 2026, 1:00 PM (UTC-6).
File name: C04_Attachment 1 - Statement of Work.pdf
The full file is for paid members, or buy this bid alone.
Preview
SOUTHWEST REGION 03
TONTO NATIONAL FOREST
FOREST-WIDE DECOMMISSIONING PROJECT
Tonto Basin Ranger District
Globe Ranger District
Statement of Work
U.S. FOREST SERVICE
1.
1.1
1.2
1.3
2.
3.
4.
4.1
4.2
4.3
5.
5.1
5.2
5.3
5.4
5.5
6.
6.1
6.2
6.3
6.4
6.5
6.6
7.
7.1
8.
8.1
8.2
9.
9.1
10.
10.1
11.
11.1
11.2
1. GENERAL INFORMATION
1.1 Background
As part of the ongoing efforts by the Tonto National Forest to achieve a more sustainable Recreation program, a Recreation Facility Master Plan was developed in 2014. Several sites were identified to be decommissioned due to being underutilized.
1.2 Scope of Work
The Tonto National Forest is looking to achieve a more sustainable recreation program. Through this project, several recreation areas will be decommissioned in the Tonto Basin Ranger District (RD), and Globe RD. The decommission of campgrounds at the Tonto Bassin RD is the base bid and at Globe RD, it is an option bid. The intent of this work is to remove and safely dispose outside of the National Forest boundaries, recreational accommodations that include but not limited to Entry station buildings, toilets buildings, sidewalks, asphalt pavement, fish cleaning stations, septic system, and parking lots.
1.3 Location
The following campgrounds have been identified to be decommissioned, and they are located on the Tonto Basin Ranger District and Globe Ranger District, Tonto National Forest. a. Indian Point Campground
33°46'04" N
111°14'23" W
b. Schoolhouse Campground
33°38'59" N
111°00'41" W
c. Windy Hill Campground
33°39'23" N
111°05'25" W
d. Grapevine Groupe site
33o37’59” N
111o02’28” W
e. Cholla Campground
33o43’38” N
111o12’15” W
f.
33o44’49” N
111o13’42” W
g. Burnt Corral Recreation Site 33o37’28” N
111o12’03” W
h. Jones Water Campground
110°38'49" W
Bermuda Flat Campground
33°35'18" N
2. TECHNICAL REQUIREMENTS / TASKS
All work shall be completed in accordance with this Scope of work and specifications. The work includes all labor, materials, and equipment necessary to perform all operations for the work specified.
a. For all decommissioning buildings, the contractor shall obtain permits like NESHAP, National Emission Standards for Hazardous Air Pollutants. The permits include testing for asbestos and lead-based paint. The contractor will need to include these permits and testing as part of a submittal and kept them in the records. The contractor shall provide a copy of the permits to the USFS Contractor Officer, CO.
b. The drawings use for this project are given for information purposes only. They are not
The beginning of the document. Download the full file to read on.