DEPARTMENT OF THE INTERIOR
BUREAU OF INDIAN EDUCATION
1011 Indian School Road, NW, Suite 332
Albuquerque, New Mexico 87104
IE056 – HAVASUPAI ELEMENTARY SCHOOL
BLDG-1022
FIRE ALARM PULL STATION RELOCATION
Dec 5, 2025
Version 7.0
1.
1.1.
1.2.
1.3.
1.4.
1.5.
1.6.
1.7.
1.8.
1.9.
2.
2.1.
2.1.1.
2.1.2.
2.1.3.
2.1.3.1.
2.1.3.2.
2.1.4.
2.1.5.
2.1.6.
2.1.7.
2.1.8.
2.2.
2.2.1.
2.3.
2.3.1.
2.3.2.
2.3.3.
2.3.4.
2.3.5.
2.4
3.
2.3.6.
2.3.7.
2.3.8.
2.3.9.
2.3.10.
2.3.11.
STATEMENT OF WORK
1. PROJECT INTRODUCTION
Project Name: Havasupai Elementary School BLDG-1022 Fire Alarm Pull Station Relocation.
The completed system shall comply with, at a minimum, NFPA 72 (2025) National Fire Alarm and Signaling Code; NFPA 101-2024/IBC means of egress requirements; the 2024 International Fire Code (IFC), including applicable fire alarm provisions; ADA/ICC A117.1 accessibility reach ranges; manufacturer installation instructions; and all Authority Having Jurisdiction (AHJ) requirements.
DSRM non-involvement for this project
Pre-construction / design review
DSRM pre-construction design review is not required for this project. The scope is limited to repair / replacement of existing manual pull stations in their current locations with functionally equivalent devices. No new fire alarm system design, reconfiguration of circuits/zones, or changes to sequence of operations are included. Accordingly, there are no construction design documents or fire/life safety shop design documents requiring DSRM review under 25 IAM 2.
DSRM final inspection / Certificate of Occupancy
A DSRM final inspection and Certificate of Occupancy are not required for this project. DSRM final inspections are intended for new systems or major rehabilitations where DSRM has reviewed and approved design documents in advance. This project consists of limited repair work on the existing system and does not constitute new construction or major rehabilitation.
DSRM involvement for this project
If the scope of work is revised to include any of the following, DSRM involvement (design review and final inspection) will be required in accordance with 25 IAM 2:
Adding new manual pull stations where they did not previously exist to correct coverage or code deficiencies.
Relocating manual pull stations or other devices in a manner that changes coverage or affects egress strategy.
Reconfiguring circuits or zoning, adding new NACs or SLCs, or making panel programming changes that affect system performance or sequence of operations. Bundling this work into a larger fire alarm system upgrade or major rehabilitation project.
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 2: Statement of Work Bldg 1023
- Attachment 3: Statement of Work Bldg 1024
- Attachment 4: Statement of Work Bldg 1025
- Attachment 8: SF1413 Statement and Acknowledgement
- Attachment 9: Wage Determination
- Sol
- Attachment 12: IE056 1023 1024 P S R -Statement of Work-Rev-13-- 0001
- Attachment 15: Letter to Helicopter Operators re regulations and landing fee 0001
- Attachment 16: Papillion Helicopters-Tepa Supai Quote 0001
- Sol Amendment 0001
- Sol Amendment 0002
- Sol Amendment 0003