Home / Breathing Air Systems Services for Fire Emergency Services… / Document

Attachment 1: Statement of Work Breathing Air Systems Maintenance Repair Sampling

Updated

A PDF document (242 KB) attached to Breathing Air Systems Services for Fire Emergency Services at EAFB and P42, from the Department of the Air Force. Due Nov 18, 2026, 12:00 PM (UTC-8).

File name: Attachment 1 - Statement of Work (SOW) Breathing Air Systems Maintenance Repair Sampling.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Statement of Work
For
Breathing Air Compressor Systems
Preventive Maintenance, Unscheduled Repair,
and Certified Air Sampling
Edwards AFB Fire Emergency Services
and
Air Force Plant 42 Fire Department

Edwards AFB, CA

19 October 2026

1. SCOPE: This Statement of Work (SOW) provides for and outlines the requirements for conducting annual maintenance, unscheduled repairs, and air samples on Bauer (TCOM26 and DOTR26-WRAF) and Stallion (Centaur) compressor systems utilized by the Edwards Air Force Base Fire Emergency Services and Plant 42 Fire Department. The Contractor shall furnish all supervision, equipment, tools, labor, materials, and supplies necessary to perform the required work. The work shall be performed in accordance with this SOW.
2. LOCATION and SITE VERIFICATION: The Contractor shall conduct work at Edwards AFB Fire Stations 1 and 4 and Plant 42 Fire Station 1. All required work will be performed at these locations by the Contractor.
3. DESCRIPTION OF WORK: The intent of this effort is to have the department’s air compressor systems maintained and repaired in accordance with manufacturer’s recommendations.
Annual Maintenance
Perform the following annual maintenance on the Centaur (Stallion Air Inc): replace oil and inspect oil pressure; inspect air pressure gauges; calibrate CO monitor/moisture indicator; change purification filters and O-rings; service auto-drain with a minor or major service kit; check auto drain for proper dump time; lubricate motor/engine; inspect on-off button/emergency stop; inspect fill whips; inspect muffler, reservoir and drain; inspect regulators; inspect doors, panels, and frame; inspect piping fittings and monitor for air leaks; ensure head bolts are at proper torque; inspect and clean cooling fans; service final separator and replace O-rings; clean compressor; inspect compressor and fill system for air leaks; inspect and replace air/intake filter; inspect and clean compressor coolers; inspect drive belts; check and record inter-stage pressure readings; and inspect door opening air system and conduct air sampling in compliance with NFPA 1989.
Perform the following maintenance on the TCOM-26 (Bauer Compressors): replace oil and inspect oil pressure; inspect air pressure gauges; calibrate CO monitor/moisture indicator; change purification filters and O-rings; service auto-drain with a minor or major service kit; check auto drain for proper dump time; lubricate motor/engine; inspect on-off

The beginning of the document. Download the full file to read on.

Other documents in this bid