STATEMENT OF WORK (SOW)
NORTHERN CHEYENNE AGENCY
YOUTH DETENTION CENTER
BUSBY, MONTANA - BUILDING #304 SEWER/WASTEWATER SYSTEM UPGRAGE PROJECT
Background:
Recent assessments show that key parts of the wastewater system located throughout the Facility’s crawl space have deteriorated, reducing flow capacity and increasing the risk of leaks and sanitary or environmental issues. These services will be performed at the Northern Cheyenne Youth Detention Center, located at 304 Mennonite Church Road, Busby, MT 59016. Scope:
The overall objective (SCOPE) of this project is to fully restore the wastewater infrastructure to a compliant, reliable, and sustainable condition that meets current engineering, environmental, and public health standards and supports safe and efficient facility operations. Objectives:
The Bureau of Indian Affairs (BIA), Rocky Mountain Region Office (RMRO), requires the rehabilitation of the existing sewage infrastructure primarily focused on the collection network piping under the facility’s first level (the crawl space). The goal of this project is to fix the wastewater system at the Northern Cheyenne Youth Detention Center by replacing or repairing the damaged parts of the sewage lines. This work will restore the system’s proper flow, prevent leaks, and ensure the facility remains safe, sanitary, and fully operational. Replacing the corroded and failing iron pipelines is necessary to prevent future leaks, contamination, and potential structural damage. Requirements:
Performance of all services will assure complete safety to public visitors, Government employees, contractor employees, and all other persons in the area. The Contractor will perform technical work in accordance with applicable publications. They include but are not limited to:
Standards AND Publications (Latest Editions):
International Plumbing Code (IPC) or Uniform Plumbing Code (UPC), whichever is applicable to the locality.
NFPA 70 National Electric Code
NFPA 101 Life Safety Code
Montana State Fire code Law
Regulations and Code Book 40 CFR 61
Other applicable OSHA requirements.
A Payment and Performance bond shall be required for the duration of the project.
Specific Tasks:
Replace approximately 500 linear feet of metal iron piping with varying diameter sizes ranging from ten(10”)-inch – four(4”)-inch with Schedule 40 polyvinyl chloride (PVC) piping. All existing metal (black iron) piping horizontally positioned and suspended by hangers shall be
The beginning of the document. Download the full file to read on.