PART I – GENERAL INFORMATION

A. BACKGROUND

The mission of Bureau of Reclamation (BOR) is to manage, develop, and protect water and related resources in an environmentally and economically sound manner and in the interest of the American public. BOR has ownership of land containing pieces of broken asbestos-cement pipe located in Yuma County, AZ. The land has been used as a gravel stockpile yard for many years as a central location to Yuma Area Office (YAO) water system facilities. The current scope requires the Contractor to collect, haul, and dispose of all material from the designated stockpile, which includes asbestos cement pipe (ACP), to an appropriate waste facility. Contractor will provide certified personnel to verify complete ACP removal at the site.

B. LOCATION

The abatement work required is located on BOR property along the Salinity Canal in Yuma County, AZ. Major cross streets are S Avenue 4-1/2E and E Levee Rd. Refer to the Project Location Map included in the Appendix Part C. Contractor is allowed to stage within the fenced stockpile yard and daisy chain a lock on the gate. Contractor shall: not obstruct Reclamation maintenance staff from continuing work activities within the yard. Reclamation’s normal operating hours are Monday through Friday 6:00AM to 4:00PM. Contractor shall notify government representative when accessing the site for both normal and after hours. Gate shall remain closed and locked after departure.

C. SITE CONDITION

The weather in Yuma County is typical of the desert southwest. Annual highs and lows range from about 120 to 30 degrees Fahrenheit, with intraday variations of up to 50 degrees. Late fall and winter temperatures are generally mild with a slight possibility of freezing during the late winter months. Strong winds and dust storms are possible throughout the year but are generally experienced during the spring months. Thunderstorms and flash floods are also possible during the “monsoon” season which generally occurs during the late summer months (August and September). Rain is also possible during the late winter and early spring months. Average yearly rainfall for the Yuma area is approximately 3 inches.