Attachment 1: Statement of Work jet boat motor
Updated
A PDF document (71 KB) attached to Ms-Mississippi Esfo-Jet Boat, from the Departmental Offices. Due Nov 25, 2026, 3:00 PM (UTC-5).
File name: Attachment_1_-_SOW_jet_boat_motor_20260910.pdf
The full file is for paid members, or buy this bid alone.
Preview
Attachment 1
Statement of Work (SOW)
Purchase of New Jet Boat Motor
U.S. Department of the Interior
U.S. Fish and Wildlife Service
Mississippi Ecological Services Field Office
1. Purpose
The U.S. Fish and Wildlife Service requires the purchase and installation of one (1) new 65 horsepower jet boat motor with tiller to support recovery and management actions for atrisk and listed species. Additionally, the transom on the existing 1760 GameChanger vessel at the Mississippi ES Field Office will likely need to be raised to meet the necessary transom height required for installation of the new motor. The vessel will be used primarily on shallow rivers to transport personnel, equipment, and supplies necessary for field work associated with wildlife recovery and management activities.
2. Scope
The contractor shall furnish one new 65 horsepower jet boat motor, raise the 1760 GameChanger vessel’s transom to the required transom height, and install the jet boat motor to the vessel. The contractor will also provide the operator manual and manufacturer warranties for the jet boat motor.
3. Minimum Technical Requirements
Jet Boat Motor
•
65 horsepower motor
•
Four-stroke outboard
•
Electric start
•
Electric trim
Boat modifications (existing vessel at MS Field Office) •
Raise transom height to the required height necessary for installation of the jet boat motor.
Fuel System
•
N/A
Electrical
•
N/A
Trailer
•
N/A
4. Required Accessories
•
N/A
5. Delivery
The U.S. Fish and Wildlife Service Mississippi Ecological Services Field Office will pick up the jet boat motor after it has been installed on the existing 1760 GameChanger vessel.
6. Inspection and Acceptance
Government personnel will inspect the vessel upon pickup. Acceptance will be based on:
•
Compliance with all specifications
•
Proper operation of engine and controls
•
Delivery of all manuals, warranty documentation, and titles/MSOs
Any deficiencies identified shall be corrected by the contractor prior to final acceptance.
7. Warranty
The contractor shall provide:
•
Manufacturer's engine warranty
•
Warranty documentation at pickup
8. Contractor Responsibilities
The contractor shall:
•
Furnish all labor, materials, and equipment.
•
Deliver a fully operational vessel.
•
Ensure compliance with all applicable U.S. Coast Guard regulations.
•
Coordinate pickup with the Mississippi Ecological Services Field Office.
9. Government Responsibilities
The Government will:
•
Inspect the vessel.
•
Accept the vessel upon satisfactory completion.
•
Process payment in accordance with contract terms.
The beginning of the document. Download the full file to read on.