Statement of Work
Minor Wall Repair, Priming and Painting
Duplex 93 River Road, Sudbury, MA
Eastern MA NWR Complex
US Fish and Wildlife Service
1. General Information a. The project is located at 93 River Road, Sudbury, MA, in the Eastern MA National Wildlife Refuge Complex. The building is a duplex residence, each apartment is approximately 1,030 sq. ft. of living space, three bedrooms, two full bathrooms, hallway, living room and kitchen
b. This statement of work is to complete painting of the entire unit of one townhome prior to use as quarters/refuge housing.
2. Scope
a. In accordance with the work requirements below, the Contractor shall complete the site prep, minor wall repairs, priming and painting for the entire residence.
3. Work Requirements
A. The contractor shall prepare all walls and ceilings, by removing all nails, glue, repairing cracks and wall damage, and sand surfaces to achieve a smooth surface. Prime and paint walls and ceilings with a minimum of 1 coat of primer and two coats of water based first quality paint guaranteeing that all wall surfaces are free of stains and marks and have a homogeneous finish. Contractor shall use a neutral color for all walls and ceilings to be approved by the refuge manager prior to initiation or the work. Surface preparation must include the following repairs: x
x
x
Wall repair of the shower surround in upstairs bathroom Wall repair of hole on the staircase
All small nail holes
B. Site Preparation and Protections
Before initiating any of the works referred above the Contractor shall protect all the floors using card boards or painting cloth and cover all the existing furniture and carpets with plastics, sealing them of dust and paint generated during the work. Before painting, remove all the light switches and electric outlet covers, wash them carefully to remove old paint and stains. Reinstall covers after painting is finished and dried. Protect all the baseboards, door frames and doors and window frames.
It is of the Contractor’s responsibility to supply all the paint, primers, repairing materials, tools, ladders, scaƯolding, and protection materials.
4. Standards
The Contractor shall comply with EM385-1-1 and check the HQUSACE Safety and Occupational Health website.
5. Submittals: a. Material submittals shall be provided for Government approval before any materials are ordered or used to complete this project. b. Onsite field investigation and measurements shall be made prior to procurement of supplies.