Attachment 1: Statement of Work WarmSpringsPaint-Flooring 5pp Redacted
Updated
A PDF document (142 KB) attached to OR Warm Springs QTRS 4 Paint/Flooring, from the Departmental Offices. Due Nov 24, 2026, 5:00 PM (UTC-8).
File name: Attch1_A04_SOW_WarmSpringsPaint-Flooring_261103_5pp_Redacted.pdf
The full file is for paid members, or buy this bid alone.
Preview
RFQ
140FF027Q0038
FWS OR-Warm Springs National Fish Hatchery
Quarters #4
Painting and Flooring Installation
STATEMENT OF WORK
1. Description of Work
The Contractor shall furnish all labor, materials, equipment, supervision, transportation, and disposal services necessary to complete interior painting and laminate flooring installation at Quarters #4, Warm Springs National Fish Hatchery, 1 Fish Hatchery Road, Warm Springs, Oregon.
All work shall be completed in a professional manner and in accordance with applicable Federal, State, and local codes and manufacturer recommendations. The residence is approximately 2,500 square feet and consists of three bedrooms, two bathrooms, kitchen, living room, dining room, closets, hallways, stairways, and basement. Offerors are responsible for verifying dimensions, quantities, and site conditions necessary to prepare their quotation.
2. Interior Painting
The Contractor shall furnish all labor, materials, and supplies necessary to prepare and paint the interior of Quarters #4.
The work includes painting of:
•
Walls
•
Ceilings
•
Doors
•
Trim
•
Closets
•
Hallways
•
Stairwell
•
Bathrooms
•
Basement areas
•
Cold air returns
The Contractor shall:
RFQ
140FF027Q0038
FWS OR-Warm Springs National Fish Hatchery
Quarters #4
Painting and Flooring Installation
1. Prepare surfaces as necessary to achieve a professional finish, including patching holes and cracks, sanding, caulking, and cleaning.
2. Remove nails, hooks, and similar hardware not required to remain. 3. Protect flooring, fixtures, appliances, windows, smoke detectors, HVAC vents, and other adjacent surfaces from damage or paint overspray. 4. Prime repaired or stained surfaces as necessary to achieve a uniform finish. 5. Apply Benjamin Moore low-VOC paint or approved equal. 6. Paint walls and ceilings with eggshell finish.
7. Paint doors and trim with semi-gloss finish.
8. Apply mold- and mildew-resistant primer in bathroom areas. 9. Remove debris daily and maintain a clean work area throughout the project. 10. Perform final cleanup upon completion of all work.
All paint colors shall be approved by the Contracting Officer's Representative (COR) prior to application.
3. Laminate Flooring Installation
The Contractor shall furnish all labor, materials, equipment, supervision, and disposal services necessary to remove existing carpet and install laminate flooring in the following areas:
•
Living room
•
Dining room
•
Hallway
•
Hallway closets
•
Entryway
•
Stairs
•
Downstairs landing area
The beginning of the document. Download the full file to read on.