Attachment 10: Statement of Work

Updated

A PDF document (287 KB) attached to WWYK240015 - Rehab Tanks 62501E & 62501W, from the Department of the Air Force. Due Nov 5, 2026, 2:00 PM (UTC-6).

File name: Att10_240015_Statement of Work.final.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

STATEMENT OF WORK

REHAB TANKS 62501E & 62501W

Project #: WWYK240015
Work Task #: 1140798
Revision: 0
Issued: 22 October 2025
1.

SCOPE

1.1

GENERAL

The work to be performed under the terms of this Order consists of furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish replacing the tanks’ internal coatings, which have exceeded their useful life and failed. Corrosion is present, cathodic protection has failed and requires repair/replacement. Secondary containment seals require repair. Construction waste material is stored in the secondary containment and requires removal and proper disposal at Tinker Air Force Base (AFB), Oklahoma (reference the project drawings for additional location information).
The Contractor shall perform a site investigation to verify existing conditions. If necessary, additional as-built drawings are available from 72 ABW/CE - Engineering Support, located in B400.
The Contractor shall be responsible for identifying the necessary logistical, architectural, and structural work elements required to perform the work as described herein. Assemblies, framework, fixtures, or apparatus not readily identified on the project drawings, specifications, or this Statement of Work (SOW) shall be provided by the Contractor as required for a complete, fully operating, and functioning system or systems ready for use by the Government. Information such as floor plan layouts and dimensions; structural, mechanical, and electrical data; and location of underground utilities provided by the Government for existing and new construction are based on available as-built documentation, field observation, and equipment selected as design basis by the Government. This information is to be considered approximate and shall be field verified by the Contractor.

1.2

DEFINITIONS

1.2.1

Contracting Officer (CO)
An individual with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the contracting officer acting within the limits of their authority as delegated by the CO. The CO is the ONLY person authorized to make any commitments or changes that will affect price, quality, quantity, delivery, or any other term or condition of the contract.

1.2.2

Contracting Officer’s Representative (COR)
An individual designated by the Contracting Officer to perform specific technical or

The beginning of the document. Download the full file to read on.