Attachment 2 2020-06-12 USGS EROS Specifications Bid Documents Rev 1
Updated
A PDF document (7.2 MB) attached to EROS Removal and replacement of chilled and conden, from the US Geological Survey. Due Nov 4, 2026, 5:00 PM (UTC-6).
File name: B08_Attachment_2_2020-06-12_USGS_EROS_Specifications_Bid_Documents_Rev_1.pdf
The full file is for paid members, or buy this bid alone.
Preview
United States
Geological Survey
Earth Resources Observation and Science Center
Phase I: EROS Fluid Coolers Design Services
06/12/2020
BID DOCUMENTS
00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
000000 - TABLE OF CONTENTS
000115 - LIST OF DRAWING SHEETS
003119 - EXISTING CONDITION INFORMATION
003126 - EXISTING HAZARDOUS MATERIAL INFORMATION
01 - GENERAL REQUIREMENTS
011000 – SUMMARY
012500 - SUBSTITUTION PROCEDURES
013100 – PROJECT MANAGEMENT AND COORDINATION
013200 - CONSTRUCTION PROGRESS DOCUMENTATION
013300 - SUBMITTAL PROCEDURES
014000 - QUALITY REQUIREMENTS
014200 – REFERENCES
016000 - PRODUCT REQUIREMENTS
017300 – EXECUTION
017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
017700 - CLOSEOUT PROCEDURES
017823 - OPERATION AND MAINTENANCE DATA
017839 - PROJECT RECORD DOCUMENTS
017900 - DEMONSTRATION AND TRAINING
02 - EXISTING CONDITIONS
024119 - SELECTIVE DEMOLITION
03 – CONCRETE
N/A
04 – MASONRY
N/A
05 – METALS
051200 – STRUCTURAL STEEL FRAMING
06 - WOOD, PLASTICS, AND COMPOSITES
061053- MISCELLANEOUS ROUGH CARPENTRY
07 - THERMAL AND MOISTURE PROTECTION
078413 - PENETRATION FIRESTOPPING
08 – OPENINGS
083113 - ACCESS DOORS AND FRAMES
09 – FINISHES
092116.23- GYPSUM BOARD SHAFT WALL ASSEMBLIES
092216- NON-STRUCTURAL METAL FRAMING
092900- GYPSUM BOARD
099123- INTERIOR PAINTING
10 – SPECIALTIES
N/A
United States
Geological Survey
Earth Resources Observation and Science Center
Phase I: EROS Fluid Coolers Design Services
06/12/2020
BID DOCUMENTS
12 – FURNISHINGS
N/A
14 - CONVEYING EQUIPMENT
N/A
23 – MECHANICAL
230000 - MECHANICAL GENERAL CONDITIONS
230010 - BASIC MECHANICAL MATERIALS AND METHODS
230050 - MOTORS
230075 - VARIABLE FREQUENCY DRIVES
230076 - VARIABLE FREQUENCY DRIVES FOR NEW CHILLERS
230100 - INSTALLATION OF MECHANICAL PIPING
230110 - HVAC WATER SYSTEMS PIPING
230200 - MECHANICAL INSULATION
230700 - HVAC WATER PUMPS
230707 - CENTRIFUGAL CHILLERS
230715 - COOLING TOWER AND SUMP
230910 - START-UP, CLEANING AND TESTING
230920 - WATER TREATMENT SYSTEMS
230930 – TESTING AND BALANCING
230960 – DIRECT DIGITAL TEMPERATURE C
26 – ELECTRICAL
260000 - BASIC ELECTRICAL REQUIREMENTS
260010 - BASIC ELECTRICAL MATERIALS AND METHODS
260070 - ELECTRICAL CONNECTIONS FOR EQUIPMENT
260110 - RACEWAYS FITTINGS AND BOXES
260120 - CONDUCTORS
260160 - SAFETY SWITCHES
260180 - LOW VOLTAGE FUSES – 600 VOLTS AND LESS
260190 - SUPPORTING DEVICES
260455 - GROUNDING SYSTEMS
28 – ELECTRONIC SAFETY AND SECURITY
N/A
31 – EARTHWORK
N/A
32 - EXTERIOR IMPROVEMENTS
N/A
United States
Geological Survey
Earth Resources Observation and Science Center
Phase I: EROS Fluid Coolers Design Services
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 10: Payroll
- Attachment 11: Form Release of Claims
- Attachment 13: Past Performance Questionnaire Past Performance Questionnaire
- Attachment 1: Statement of Work EROS Chilled and Condenser Water Piping
- Attachment 4 2020-06-12 USGS EROS Mech Narrative Bid Documents
- Attachment 6: Wage Determination dtd
- Attachment 8: Performance Bond SF25-23a upon award
- Attachment 9: Subcontractor Ack SF1413-23a upon award
- Sol
- Sol Amendment 0001
- Attachment 14: Vendor Questions Amendment 002 0002
- Attachment 1: Statement of Work EROS Chilled and Condenser Water Piping Rev 1 0002