Attachment 2: Bid Schedule Rev 1
Updated
A PDF document (1.3 MB) attached to Packing and Crating Services, from the Department of the Air Force. Due Nov 3, 2026, 2:00 PM (UTC-5).
File name: Attachment 2 - Bid Schedule Rev 1.pdf
The full file is for paid members, or buy this bid alone.
Preview
FA480327Q0003
Attachment 2
ESTIMATED QUANTITIES
Zone 38
Base Year
CLINs 0001-0003
1 Jan 2027 – 31 Dec 2027
The quantities shown by area of performance for each item in this Solicitation are the Government’s estimates of requirements, which may be ordered during the period of the contract. The Government’s estimated maximum daily requirements, excluding Saturday, Sunday; National, State, and local holidays are listed below by area of performance within each schedule. Bidders must complete the “Bidder's Guaranteed Daily Capability”, which must equal or exceed the Government’s minimum acceptable daily capability, for all items within an area of performance for which they submit bids. Failure to do so will render the bid non responsive.
OUTBOUND
(Schedule I)
Area 38
INBOUND
(Schedule II)
Area 38
INTRA-CITY AREA
(Schedule III)
Area 38
Government’s
Estimated
Maximum Daily
Requirement
NCWT
Government’s
Minimum
Acceptable
Daily
Capability
NCWT
NCWT
NCWT
NCWT
NCWT
NCWT
NCWT
Pages 1 of 145
Bidder’s
Guaranteed
Daily
Capability
NCWT
FA480327Q0003
Attachment 2
SCHEDULE I
OUTBOUND SERVICES
CLIN 0001
Item 0001. Complete Service - Outbound (HHG). Services must include premove survey, servicing of appliances, disassembly of furniture, packaging, inventorying, tagging, wrapping, padding, packing and bracing of HHG in Government-owned and furnished shipping containers (Shipping Container Commercial Spec ASTM-D4169-14, SDDC Pamphlet 55-12) at member’s/employee’s residence, or at contractor’s facility when ordered by the contracting officer, properly securing and sealing for shipment, weighing, obliterating old markings, marking, strapping, and drayage of the container within an area of performance. Contractor will complete a post walk around with members/employee’s to ensure no damage occurred during pack out. Service must also include loading of shipments on linehaul carrier’s equipment at the contractor’s facility. When containers will not accommodate all articles of any one lot, loose articles must be packed in the said containers before any over-packed articles are placed therein. Overflow, oversize, and other shipments must be paid for under Item 0003.
Area 38
AA. At member/employee residence:
Container, Commercial Spec
ASTM-D4169-14, or SDDC
Pamphlet 55-12
AB. At contractor’s facility:
Container, Commercial Spec
ASTM-D4169-14, or SDDC
Pamphlet 55-12
Estimated
Annual
Quantity
Unit
NCWT
NCWT
Unit
Price
Total
Item 0002. Outbound (HHG From Nontemporary Storage). Service must be the same as Item 0001
The beginning of the document. Download the full file to read on.