Attachment 1

STATEMENT OF WORK (SOW)

1. SCOPE OF WORK

a. The contractor shall procure and provide to Customs and Border Protection (CBP) canines that are suitable for training.
b. CBP has the option to procure up to 25% for additional canines from the RFQ stated quantity. NOTE: CBP has one Canine Program at two locations. Hence, any canine that is presented for testing at one location either Front Royal or El Paso, is considered presented at both. Therefore, if a canine fails selection, this dog should not be presented again at either location; unless specifically requested/pre-approved by CBP.

2. CBP and CONTRACTOR’S RESPONSIBILITIES

a. Canines are required to be in-place no-later-than 30-days from award notification by the contracting Officer.
b. The contractor has 60-days after each receipt of notification of non-acceptance to furnish a replacement canine(s). After 150-days of award notification, CBP reserves the right to terminate any outstanding portion(s) of the order. Vendors who have been terminated for any outstanding part of their order will not be eligible for the re-compete orders.
c. Any canine(s) that fails to pass the requirements or physical testing performed by CBP will not be accepted; the contractor will bear all expenses associated with the return of the canine to the contractor’s site within 7-days after receiving notification.
d. CBP will be responsible for the care and feeding of the canine(s) up to the 7th day; after such date, unless other arrangements have been made, all expenses incurred by CBP for the care of the canine(s) will be deducted from the contractor’s invoice for payment (rates will be based on standard commercial practices).
e. The contractor is responsible for all transportation arrangements for shipment and retrieval and costs associated with those shipment and retrieval of the canine(s). f. CBP shall make all determinations as to the acceptability/unacceptability of canines. g. Upon completion of selection testing vendor will be afforded the opportunity for an out brief on failed canine(s). This out brief will consist of basic information on why canine(s) failed (i.e. lack of hunt drive, stable character issues, etc.).
g. The contractor shall not make CBP responsible for the disposition of a medically defective canine(s). h. CBP’s purchase process is typically carried out in three separate phases: Pre-Screening, Medical, and Behavioral Evaluations. A candidate canine must pass all three phases before CBP takes ownership.

The beginning of the document. Download the full file to read on.