SECTION C

SPECIFICATIONS FOR

LOLETA RECREATION AREA WATER SYSTEM IMPROVEMENTS – PHASE 1

DATED 2-11-2025

(revised 6-22-2026)

SECTION

PAGE

011000 - SUMMARY

011400 - WORK RESTRICTIONS

012700 – MEASUREMENT AND PAYMENT

013100 – PROJECT MANAGEMENT AND COORDINATION

013300 – SUBMITTAL PROCEDURES

014000 – QUALITY CONTROL

014200 – REFERENCES

015000 – TEMPORARY FACILITIES AND CONTROLS

017000 – EXECUTION REQUIREMENTS

017320 – SELECTIVE DEMOLITION

017700 – CLOSEOUT PROCEDURES

033000 – CAST-IN-PLACE AND PRECAST CONCRETE

133300 – POLE BUILDING STRUCTURES

221114 – WATER DISTRIBUTION

260500 – BASIC ELECTRICAL MATERIALS AND METHODS

329200 – TURF AND GRASSES

SECTION 011000 – SUMMARY

PART 1 - GENERAL

1.1

PROJECT IDENTIFICATION

A.

Project Name and Location: Loleta Recreation Area Water System Improvements – Phase 1. From the Marienville Ranger District Office located at 131 Smokey Lane, Marienville, PA 16239, travel southwest on PA-66 for 1.6 miles. Turn slight left onto South Forest Street for 0.7 miles. South Forest Road becomes Loleta Road just before the West Millstone Road and Loleta Recreation Area will be on the left. The campground entrance is signed. GPS coordinates of the campground are N 41.401944 and W 79.081111. The Marienville Ranger District Office has a phone number of 814-927-6628 and the Allegheny National Forest Supervisors Office has a phone number of 814-728-6100.

B.

Project Summary Description: The project includes the installation of new water distribution piping, spigots, valves, concrete work, well house, modification of existing electrical service, selective demolition and other project supplemental items. Work includes, but is not limited to, the following:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.

C.

1.2

Mobilization to site.
Selective demolition.
Furnish & install new well house.
Furnish & install all new water piping & fixtures in new well house. Furnish & install 1” HDPE water line.
Furnish & install 2” HDPE water line.
Furnish & install 4” PVC water line.
Furnish & install valve box.
Furnish & install spigot assembly.
Furnish & install drain.
Well modifications.
Electrical allowance - to meter.
Electrical work - from meter.
Pump yield test.
Pressure testing.
Chlorination of water system
Well water quality testing
Site restoration / turf establishment
Commissioning of new work

Government or Owner refers to the USDA Forest Service. Contracting Officer (CO) refers to the