USCGC OAK (WLB 211)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2026
Developed By: Bryan G Wright
(Rev-0, 28 August 2026)
USCGC OAK (WLB-225B) DOCKSIDE AVAILABILITY FY2026
WORK ITEM 13: Compressed Air Receivers and System Valves, All, Clean, Inspect, Hydro and Lift ... 56
ii
(Draft-0)
USCGC OAK (WLB-225B) DOCKSIDE AVAILABILITY FY2026
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE
REV#
WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iii
(Draft-0)
USCGC OAK (WLB-225B) DOCKSIDE AVAILABILITY FY2026
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 225 WLB 259-005, Rev C, Combustion Intake & Exhaust A&D Hull Block 940 Coast Guard Drawing 225 WLB 801-020, Rev B, Tank CAPACITY - 95% Curves Coast Guard Drawing 225B WLB 541-007, Rev D; Incinerator Fuel Oil Service Tank Coast Guard Drawing 225B WLB 573-001, Rev E, Buoy Handling System Arrangement Coast Guard Drawing 225B WLB 259-001, Rev D, Combustion Intake & Exhaust Diagram Coast Guard Drawing 225B WLB 259-005, Rev C, Combustion Intake & Exhaust A&D Hull Block 940 Coast Guard Drawing 225B WLB 259-006, Rev D, Combustion Intake & Exhaust A&D Hull Blocks 970 & 975
Coast Guard Drawing 225B WLB 512-001, Rev K, HVAC Diagram Coast Guard Drawing 225B WLB 512-007, Rev B, HVAC A&D, Fr 66-92, Innerbttm & 1st Platform Coast Guard Drawing 225B WLB 512-017, Rev B, MMA HVAC System Diagram
The beginning of the document. Download the full file to read on.