Home / W9124G26CBARRACKS / Document

Attachment 2: Performance Work Statement

Updated

A Word document (40 KB) attached to W9124G26CBARRACKS, from the Department of the Army. Due Nov 17, 2026, 12:00 PM (UTC-6).

File name: Attachment 2_Performance Work Statement.docx

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Performance Work Statement
Security Cameras for Barracks
164th TAOG Barracks
BLDG’s 8350, 8354, 8355, 8356 3rd St.
Fort Rucker, AL 36362

1.0 General:

The 164th Theater Airfield Operations Group (TAOG) has a mission to promote an environment of the safety and security for all United States Army Aviation Center of Excellence (USAACE) and Fort Rucker personnel, military, civilian, and family members. It is incumbent to enforce a zero-tolerance atmosphere concerning sexual harassment and sexual assault. The 164th TAOG has a requirement for the inspection, and maintenance of closed-circuit televisions located at buildings 8350, 8354, 8355, and 8356 with a centralized monitoring station located in BLDG 8350, the Single Soldier Barracks on Fort Rucker, Alabama.

2.0 Scope:

The Contractor shall furnish all personnel, management, tools, equipment, materials, and transportation necessary to integrate, configure, and maintain the existing Government-Furnished Equipment (GFE) closed-circuit television (CCTV) / surveillance cameras located across the designated barracks facilities into a central system location. The objective is to ensure comprehensive visual coverage/field of view of the designated areas (8356, 8355, 8354, 8350) using existing barracks camera feeds into the central location (building 8350). The Contractor is responsible for providing all necessary ancillary integration materials—including, but not limited to, network cabling (Cat6/fiber), connectors, mounting brackets, network patch panels, and compatible network switches—to achieve a fully functional, integrated, central security surveillance system. The requirement must support real-time video monitoring in the centralized monitoring point throughout the entire 164th TAOG Brigade (Single Soldier barracks) located at Fort Rucker, Alabama. The contractor will be responsible for network configuration, port forwarding, and any software/hardware installation required to stream video from buildings 8354, 8355, and 8356 to the central monitoring station in building 8350.

3.0 Maintenance

The contractor shall provide maintenance of the CCTV system installed into Soldiers Barracks according to the included Security Camera Maintenance Checklist. Contractor will adjust viewing angles of cameras and adjustments to system at the time of the inspections. The contractor will provide written notification of completion of the semi-annual maintenance within 48hrs of completion.

4.0 Service Contract Reporting.

4.1 Accounting For Contract Services – If required by FAR Subpart 4.17, the Contractor shall report contract performance data annually directly into SAM.gov (www.sam.gov). The Contractor is not required to submit reporting through legacy Army CMRA applications.

The beginning of the document. Download the full file to read on.

Other documents in this bid