Home / Pipeline Safety Research and Development (R&D) - Research… / Document

Attachment 2: Project Deliverables

Updated

A Word document (31 KB) attached to Pipeline Safety Research and Development (R&D) - Research Announcement 12, from the Pipeline and Hazardous Materials Safety Administration. Due Nov 2, 2026, 5:00 PM (UTC-5).

File name: Attachment 2 - Project Deliverables 693JK326RA001.docx

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

SAMPLE SAMPLE SAMPLE SAMPLE

PROJECT DELIVERABLES

Conduct Kick-Off Team meeting and determine experimental procedure to measure residual stress. Results due to DOT within 3 months of the effective date of the Agreement. Conduct analytical and finite element analysis to calculate residual stress and align experimental results with the mechanical modeling. Results due to DOT within 6 months of the effective date of the Agreement. Measure material properties, residual stress, prepare free films and adhesion test panels, and establish mechanical modeling of the residual stress of the multi-layer coatings. Results due to DOT within 9 months of the effective date of the Agreement. Conduct adhesion and free film degradation test and residual stress relaxation testing. Results due to DOT within 21 months of the effective date of Agreement. Establish an understanding of multi-layer pipeline coating disbondment mechanism(s) due to residual stress development resulting from coating manufacturing/extrusion process and characteristics of surface anchor profile and surface preparation methods. Due to DOT within 24 months of the effective date of the Agreement. Determine a recommended strategy to reduce multi-layer pipeline coating disbondment. Due to DOT within 24 months of the effective date of the Agreement. Prepare and submit quarterly status reports, monthly progress reports, final project report, final research brief, and peer review reports in accordance with the Agreement. Prepare paper submission to conference presentations and publication to NACE or other pipeline conference. Due to DOT within 24 months of the effective date of the Agreement.

SAMPLE SAMPLE SAMPLE SAMPLE

The beginning of the document. Download the full file to read on.

Other documents in this bid