Home / Repair HVAC Seedling Coolers - Six Rivers NF- Gasquet RD / Document

Attachment 2: Schedule of Items Tree Coolers

Updated

A PDF document (124 KB) attached to Repair HVAC Seedling Coolers - Six Rivers NF- Gasquet RD, from the Forest Service. Due Dec 1, 2026, 4:30 PM (UTC-8).

File name: Attachment 2 - Schedule_of_Items_Tree_Coolers.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Repair HVAC Seedling Coolers
127EAY27Q0007 Six Rivers National Forest

Schedule of Items
Project Description: Repair HVAC Seedling Coolers

CLIN

Description

0001

Cooler System #1 (SN7800124) – Condenser
Replacement
Cooler System #2 (SN7800125) – Start Component
Replacement and Diagnostics.

0002

Qty

Unit
of
Issue

EA

EA

Schedule Notes:

Unit
Price

Total
$

$

TOTAL

$

(a) The Government intends to make one award from this solicitation. Therefore, to be considered responsive, contractors must submit pricing for all items. (b) All items must have clear traceability to the Original Equipment Manufacturer (OEM), NORLAKE, Inc. https://norlake.com. Traceability means a clear, complete, documented, and auditable paper trail which traces each step from an OEM or distributor to its current location. The contractor shall furnish a Certificate of Conformance (COC) in accordance with Federal Acquisition Regulation (FAR) clause 52.246-15. COC must be submitted in the format specified in the clause. Offerors must be able to provide necessary certification including traceability to the manufacturer, manufacturer's COC, and its own certificate of conformance. Prospective vendors who are not the OEM or an authorized distributor must provide traceability for the offered product back to the manufacturer or authorized distributor. Concerns having the expertise and required capabilities to provide these items are invited to submit offers in accordance with the requirements stipulated in this solicitation. Alternate Parts will be authorized if they are an approved alternate part that satisfies all form, fit, and function requirements of the original parts and conform to the approved configuration. All parts shall be NEW approved parts.
(c) Contractor must be an EPA Section 608/609 certified HVAC/R with refrigeration repair experience.
https://www.epa.gov/section608/section-608-technician-certification-0 https://www.google.com/search?q=epa+Section+608%2F609

The beginning of the document. Download the full file to read on.

Other documents in this bid