Justification and Approval
For Other than Full and Open Competition
Plan ID Number: 2027-LGD-0061
Justification & Approval
For Other than Full and Open Competition
As a legislative branch agency, the Library is subject to the competition and advertising requirements of 41 U.S.C. § 6101. Like the Competition in Contracting Act and the FAR, 41 U.S.C. § 6101 does not require competition when a contracting officer certifies that only one source or brand-name item is available, when dictated by public exigency, or when otherwise authorized by law. This document sets forth the justification and approval for award of a contract or order by means providing for other than full and open competition per 41 U.S.C. § 6101, LCR 7-210, and, as applicable, FAR 6.302, FAR 13.106-1, FAR 8.405, and FAR 16.505. Contracting without competition shall not be justified on the basis of a lack of advance planning or concerns related to availability of funds. This form shall be used to support instances where competition will be limited to a single source, a limited number of sources, including where a brand name product is required.
Part 1 – Identification
1.
2.
3.
Contracting Agency and Activity: Library of Congress, LCSG/DPS/PRES/PSD Nature of Action Being Approved
Contract (or modification)
LoC or Leg Branch Order (or modification)
GSA Schedule or GWAC: Identify Schedule/Contract
Other: Identify
Plan ID Number: 2027-LGD-0061
Contractor (or Brand Name): Preservation Technologies, LP Estimated Value (Base and all options): $600,000.00
Period of Performance: 04/01/2027 – 03/31/2028, One 12-month period of performance – stand alone contract (not an IDIQ)
Description of Supplies or Services Required to Meet Library Needs
Describe the supplies or services that are required to meet the Library’s minimum needs and the delivery schedule required to meet those needs. Do not focus on a description of the program.
The Library requires the following supplies or services: The Library of Congress requires contractor support for mass deacidification of bound volumes primarily printed on acidic paper. Librarians and archivists have been aware of the worldwide preservation problems that began in the mid1800s when acidic wood pulp was substituted for cotton rags in the manufacture of paper. The introduction of wood pulp and chemicals in the manufacturing process resulted in printed volumes produced with acidic paper stock which, without intervention, becomes brittle and unusable over